{"id":"millennium-tower","title":"Millennium Tower — perimeter-pile underpinning and monitored load transfer","summary":"The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.","topics":["deep-foundations","settlement","monitoring","delivery"],"country":"United States","region":"San Francisco","owner":"Millennium Tower Homeowners Association","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underpinning","Rock-founded piles","Jacked load transfer"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer distinguishes the earlier 52-pile proposal from the implemented 18-pile solution. The city’s earlier environmental sheet is retained as proposal-stage evidence, not the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The remedial designer reports completion in September 2023 with occupancy maintained during the work.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The designer reports initial post-work behavior and a ten-year monitoring requirement; long-term performance is still a monitoring question.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a monitored perimeter underpinning concept while keeping an occupied building in service.","inputs":["Compare the original proposal and later constructed solution without mixing their quantities.","Extract the load-transfer concept and identify the pile-installation effects that prompted revision."],"deliverables":["Balance imposed pile load, existing-foundation capacity and differential movement.","Prepare installation trials, staged jacking steps and ten-year monitoring objectives.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can installing a settlement remedy initially increase settlement?","How should load-transfer fuses protect the original foundation if future differential movement occurs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Perimeter-pile upgrade and observed outcome","url":"https://www.sgh.com/project-story/millennium-tower/","publisher":"Simpson Gumpertz & Heger, remedial designer","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"2019 proposed upgrade information sheet","url":"https://media.api.sf.gov/documents/301_Mission_Information_Sheet_CEQA_Notice.pdf","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Millennium Tower adding pile section 2.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millennium-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/schematic"},{"id":"project-image","title":"Millennium Tower adding pile section 2.agr.jpg","kind":"project-image","fileName":"millennium-tower.jpg","mimeType":"image/jpeg","bytes":858661,"sha256":"351acb58a3af5bd4bd050a171a013934d81a3c8d9e2085f72a092435946fb878","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1707,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-02-22 16:17:55","evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/07/Millennium_Tower_adding_pile_section_2.agr.jpg","downloadUrl":"/cases/millennium-tower/download/project-image","originalSha1":"d4e2c44c3246b245231a17a0d012fb7bd9790ff5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millennium-tower-capstone.md","mimeType":"text/markdown","bytes":3232,"sha256":"25bd5057fc007e9cb063539a06b2a2495726a31f43bf1ebbbd69ecd1f5cba045","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco.","caption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1707,"imageDate":"2022-02-22 16:17:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":61,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":863092,"sourceCount":3,"url":"/cases/millennium-tower"}