# Milltown Reservoir — dam removal and contaminated sediment remediation

Case reference year: 2009 | Location: Missoula County, Montana, United States

Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a phased contaminated-sediment removal plan while maintaining downstream water quality and protecting nearby wells.

### Inputs to assemble

- Extract the remedy scope for the reservoir operable unit, not the entire Clark Fork site.
- Identify sediment handling, groundwater and restored-channel monitoring information.

### Deliverables

- Prepare a dewatering/well-impact assessment and sediment handling sequence.
- Compare excavation, onsite containment and capping with monitoring/closure criteria.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

EPA’s five-year review describes the implemented remedy and site components. Different operable units have different completion status.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The 2021 review records remedial work beginning in 2006 and final dam removal in March 2009; later site restoration and monitoring followed.

### Completion and records — partial

The five-year review evaluates remedy performance; it does not state that every Clark Fork operable unit is complete.

## Project image

Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.

Credit: M Kustudia
Image source: https://commons.wikimedia.org/wiki/File:Excavation.jpg
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Third five-year review — Milltown Reservoir/Clark Fork (US EPA; 2021): https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P101GPHY.TXT
- Milltown Reservoir Sediments cleanup profile (US EPA; date not stated): https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0800445
- Excavation.jpg — image and reuse license (Wikimedia Commons / M Kustudia; 2008): https://commons.wikimedia.org/wiki/File:Excavation.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.