# Mosul Dam — maintenance grouting in soluble foundations

Case reference year: 2019 | Location: Tigris River, northern Iraq, Iraq

The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop an operations-linked grouting and surveillance plan for a dam on a dissolving foundation.

### Inputs to assemble

- Identify the soluble strata, access-gallery function and monitoring system described by the project team.
- Define study groundwater chemistry and hydraulic gradients, marking them as assumptions where unpublished.

### Deliverables

- Compare targeted and blanket grouting using permeability and grout-take scenarios.
- Create inspection, drilling, instrumentation and response schedules that remain workable during outages.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Why is completion of a rehabilitation contract different from ending maintenance grouting?
- How can changing grout take indicate either successful closure or a new flow path?

## Published project information

### Design — partial

USACE’s project history explains the grouting-gallery purpose and the 2016–2019 rehabilitation. It does not portray dissolution as permanently eliminated.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The history documents the 2016–2019 task force; operation and maintenance remained the responsibility of Iraq’s Ministry of Water Resources.

### Completion and records — partial

The source records equipment, workforce and instrumentation improvements, with continued grouting required.

## Project image

Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.

Credit: This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .
Image source: https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing

## Sources

- Mosul Dam Task Force project history (USACE Transatlantic Division; date not stated): https://www.tad.usace.army.mil/About/History/
- Mosul Dam seepage.jpg — image and reuse license (Wikimedia Commons / This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .; 2007): https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.