{"id":"nj-turnpike-micropiles","title":"New Jersey Turnpike bridges — micropile underpinning","summary":"Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.","topics":["deep-foundations","scour-erosion","monitoring","delivery"],"country":"United States","region":"New Jersey","owner":"New Jersey highway agencies; see source","year":2008,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Hollow-bar micropiles","Underpinning","Verification/proof testing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case reports an 80-kip design load per micropile, cased exposure to scour level and different bond lengths at the four bridges.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports production proof tests and sacrificial verification tests.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan underpinning of an operating bridge with limited access and a temporary cofferdam.","inputs":["Select one of the four bridges and retain its soil profile, bond length and grout diameter.","Extract verification and production proof-test criteria."],"deliverables":["Check grout-ground bond, steel capacity and corrosion/scour exposure.","Prepare a load-transfer sequence and a test-and-acceptance schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Existing bridge retrofits, Turnpike, New Jersey","url":"https://www.geoinstitute.org/node/8358","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Gómez et al. (2008), Hollow Core Bar Micropile—Design Parameters Interpreted from 404 Load Tests.","checked":"2026-11-22"},{"id":"s2","title":"Bond Strength of Hollow-Core Bar Micropiles","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nj-turnpike-micropiles.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/schematic"},{"id":"project-image","title":"New Jersey Turnpike — micropile installation beneath a bridge","kind":"project-image","fileName":"nj-turnpike-micropiles-r13.jpeg","mimeType":"image/jpeg","bytes":28249,"sha256":"4678f47c6011a4c3fa0d2d05bb71100f88236b51368c43788e87e1e54853f8cd","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":426,"height":374,"credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2008","evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=2920&context=icchge","originalSha256":"a179eebce7ffb4e8e8313d962d90c9afe1486157038f57824499780f01df1b8e","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/nj-turnpike-micropiles/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nj-turnpike-micropiles-capstone.md","mimeType":"text/markdown","bytes":2919,"sha256":"2f89cefca8d0332f0acc0a04130440eb9e506f61c8d196d4ad95ebc36da9c74d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","caption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":426,"height":374,"imageDate":"2008","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph"},"figureCaption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":7,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":32367,"sourceCount":2,"url":"/cases/nj-turnpike-micropiles"}