{"id":"northern-line-extension","title":"Northern Line Extension — settlement assessment and station-box interfaces","summary":"The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.","topics":["tunnels","excavation","monitoring","lateral-foundations"],"country":"United Kingdom","region":"Kennington to Battersea, London","owner":"Transport for London","year":2021,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Settlement troughs","Building damage assessment","Diaphragm walls"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental assessment is a design-stage screening document, while the designer reports built features and opening. Predicted settlement values must not be presented as measured outcomes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The designer records passenger opening in September 2021; the settlement-assessment documents predate construction.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a staged settlement assessment for a tunnel approaching a station box beneath a dense urban neighborhood.","inputs":["Extract the screening assumptions and distinguish greenfield analysis from building interaction.","Identify the owner’s survey and monitoring commitments for affected properties."],"deliverables":["Calculate overlapping tunnel/box settlement envelopes with volume-loss sensitivity.","Propose building-specific follow-up analyses and monitoring/compensation arrangements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a conservative greenfield prediction be unsuitable as a direct building-damage estimate?","How should deep foundations crossing the tunnel influence the screening process?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground movement assessment","url":"https://content.tfl.gov.uk/nle-twa-environmental-statement-volume-iic-appendix-i-part-4-a17-4d.pdf","publisher":"Buro Happold / Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Settlement commitments","url":"https://tfl.gov.uk/cdn/static/cms/documents/commitment-1-settlement.pdf","publisher":"Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Designer project account","url":"https://www.mottmac.com/en/projects/northern-line-extension/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Northern line extension construction site, SW8.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","publisher":"Wikimedia Commons / sludgegulper","year":2016,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"northern-line-extension.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/schematic"},{"id":"project-image","title":"Northern line extension construction site, SW8.jpg","kind":"project-image","fileName":"northern-line-extension.jpg","mimeType":"image/jpeg","bytes":422345,"sha256":"f4462889444ce02b4c781ef4bbf522a5573244ce74ff062bf476cfbd50c698fd","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":1707,"credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2016-03-11 12:38:22","evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/3c/Northern_line_extension_construction_site%2C_SW8.jpg","downloadUrl":"/cases/northern-line-extension/download/project-image","originalSha1":"3806f56827ba3cb38637a262dcd624ef348b915e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"northern-line-extension-capstone.md","mimeType":"text/markdown","bytes":3319,"sha256":"cb2697c5975600fbf469eabdf4cd496ff91056b5d2ddf37e77b93a4e903f748f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Battersea station construction site for the Northern Line Extension.","caption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":1707,"imageDate":"2016-03-11 12:38:22","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":99,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":426789,"sourceCount":4,"url":"/cases/northern-line-extension"}