# US 64 Ocoee Gorge — emergency rockslide stabilization

Case reference year: 2010 | Location: Polk County, Tennessee, United States

Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a temporary and permanent rock-slope repair plan with worker exclusion zones and weather allowances.

### Inputs to assemble

- Extract the documented failures, access limitations and installed treatment quantities.
- Identify discontinuity mapping and block geometry required for a study design.

### Deliverables

- Prepare a kinematic stability assessment and concept bolt/fence layout.
- Build a weather-sensitive schedule and quantity-based estimate.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The owner update documents stabilization quantities and sequencing. The technical conference account describes geological failure mechanisms.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The March 2010 owner update revised the expected reopening date to April 16 after weather delays; this was a forecast at publication.

### Completion and records — partial

Progress quantities and a technical case paper are linked; a final account was not found.

## Project image

The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.

Credit: Photograph published with Vanessa Bateman’s TDOT project article in ASHE SCANNER, Spring 2011
Image source: https://ashe.pro/documents/archives/scanner/2011-2.pdf
Image rights: No open reuse license verified; original copyright retained — https://ashe.pro/documents/archives/scanner/2011-2.pdf

## Sources

- US 64 to reopen April 16 — project update (Tennessee DOT; 2010): https://comptroller.extglb.tn.gov/news/2010/3/19/u.s.-64-to-reopen-april-16.html
- Emergency rockslide mitigation in the Ocoee River Gorge (Jay Smerekanicz / project conference paper; 2010): https://www.researchgate.net/publication/335319508_Emergency_Rockslide_Mitigation_in_Eastern_Tennessee_US_64_Through_the_Ocoee_River_Gorge_2009-2010
- US 64, Polk County, Tennessee — Emergency Rock Slope Stabilization in the Ocoee Gorge (American Society of Highway Engineers / TDOT project author; 2009): https://ashe.pro/documents/archives/scanner/2011-2.pdf

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.