# Olmsted Locks and Dam — marine construction and project controls

Case reference year: 2018 | Location: Ohio River, Illinois–Kentucky, United States

The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Compare construction sequencing and foundation-installation risks for a major river structure while maintaining navigation.

### Inputs to assemble

- Extract the published work packages, dated cost scorecard and operational milestone.
- Identify missing geotechnical design and production-rate information before pricing a study alternative.

### Deliverables

- Develop a river-access, foundation-installation and closure sequence.
- Reconcile planned, earned and actual cost terminology without treating budgeted quantities as final expenditures.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The public project material supports marine construction and sequencing studies; detailed foundation design must be obtained from project-specific technical records.

### Cost information — partial

The August 2018 scorecard distinguishes planned, earned and actual expenditure at its reporting date; it is not the final closeout account.

### Schedule information — partial

The 2018 update gives planned versus current completion/operational milestones; the ribbon-cutting release records the August 2018 event.

### Completion and records — partial

Owner completion and award accounts are available; a full geotechnical completion report was not located.

## Project image

Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.

Credit: LouisvilleUSACE
Image source: https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing

## Sources

- Olmsted Locks and Dam — August 2018 update (USACE; 2018): https://www.iwr.usace.army.mil/Portals/70/docs/IWUB/board_meetings/meeting88/UB88_01_Olmsted_Locks_and_Dam_Update_Rissler_28Aug18.pdf
- Corps cuts ribbon on Olmsted project (USACE; 2018): https://www.lrd.usace.army.mil/News/News-Releases/Article/1617621/corps-cuts-ribbon-on-olmsted-locks-and-dam-project/
- Olmsted Locks and Dam aerial view.jpg — image and reuse license (Wikimedia Commons / LouisvilleUSACE; 2013): https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.