# Olyphant distribution centre — variable mine-spoil improvement

Case reference year: 2022 | Location: Olyphant, Pennsylvania, United States

A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.

### Inputs to assemble

- Extract fill depths, initial/post-treatment tests and observed crater response.
- Separate warehouse foundation requirements from yard pavement requirements.

### Deliverables

- Develop treatment zoning and a field trial with measurable acceptance criteria.
- Compare additional compaction, aggregate piers and excavation/replacement.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.

### Cost information — partial

The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.

### Schedule information — partial

The documented project period is 2021–2022.

### Completion and records — partial

The case includes post-improvement SPT and pier-modulus verification.

## Published reference values

Use each value only within its stated scope. Reported costs have not been escalated or adjusted for inflation. These are source facts, not student design assumptions.

| Quantity | Value | Unit | Scope | Source locator |
| --- | ---: | --- | --- | --- |
| Dynamic-compaction package | 950,000 | USD | Approximate dynamic-compaction cost; earthworks and aggregate columns excluded. | [Cost Information](https://www.geoinstitute.org/node/16272) |

## Project image

The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.

Credit: Densification, Inc.; published by ASCE Geo-Institute
Image source: https://www.geoinstitute.org/node/16272
Image rights: No open reuse license verified; original copyright retained — https://www.geoinstitute.org/node/16272

## Sources

- Distribution Center Site, Olyphant, PA (ASCE Geo-Institute / named case-history author; 2023): https://www.geoinstitute.org/node/16272

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.