{"id":"olyphant-distribution","title":"Olyphant distribution centre — variable mine-spoil improvement","summary":"A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.","topics":["ground-improvement","shallow-foundations","problem-soils","earthworks"],"country":"United States","region":"Olyphant, Pennsylvania","owner":"D&L Realty","year":2022,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Aggregate piers","Performance verification"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented project period is 2021–2022.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case includes post-improvement SPT and pier-modulus verification.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.","inputs":["Extract fill depths, initial/post-treatment tests and observed crater response.","Separate warehouse foundation requirements from yard pavement requirements."],"deliverables":["Develop treatment zoning and a field trial with measurable acceptance criteria.","Compare additional compaction, aggregate piers and excavation/replacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Distribution Center Site, Olyphant, PA","url":"https://www.geoinstitute.org/node/16272","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olyphant-distribution.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"olyphant-distribution-reference-values.csv","mimeType":"text/csv","bytes":303,"sha256":"d8e12ade8ad0afe7e13e24904df73ef410ab81246c1bad7429660474dab67db5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/olyphant-distribution/download/reference-values"},{"id":"project-image","title":"Olyphant distribution centre — ground-improvement site","kind":"project-image","fileName":"olyphant-distribution-r13.jpg","mimeType":"image/jpeg","bytes":221097,"sha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":683,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","licenseUrl":"https://www.geoinstitute.org/node/16272","imageDate":null,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/olyphant_center.jpg","originalSha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/olyphant-distribution/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olyphant-distribution-capstone.md","mimeType":"text/markdown","bytes":3085,"sha256":"045c75f6403a1a2cc930baac411103cf2ddb62188ab04145e021984c45afbc77","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","caption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16272","width":1024,"height":683,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":13,"referenceValues":[{"label":"Dynamic-compaction package","value":950000,"unit":"USD","scope":"Approximate dynamic-compaction cost; earthworks and aggregate columns excluded.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4576,"sourceCount":1,"url":"/cases/olyphant-distribution"}