# Osman Gazi Bridge — seismic caissons on gravel beds

Case reference year: 2016 | Location: Izmit Bay, Türkiye

The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.

### Inputs to assemble

- Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.
- Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response.

### Deliverables

- Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.
- Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?
- Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?

## Published project information

### Design — partial

The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.

### Completion and records — partial

The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.

## Project image

The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.

Credit: Erdmkiliic / Wikimedia Commons
Image source: https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg
Image rights: CC BY-SA 4.0 — https://creativecommons.org/licenses/by-sa/4.0

## Sources

- Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge (Project design authors / CFMS conference proceedings; date not stated): https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf
- Osman Gazi Bridge construction sequence (IHI Infra-square; date not stated): https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html
- Osman Gazi Bridge project account (Webuild; date not stated): https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/
- Osman-Gazi-Bridge-620x410.jpg (Erdmkiliic; 2016): https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.