{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"}