{"id":"palm-jumeirah","title":"Palm Jumeirah — densification of reclaimed sand","summary":"The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.","topics":["ground-improvement","coastal-offshore","seismic","earthworks"],"country":"United Arab Emirates","region":"Dubai","owner":"Nakheel","year":2006,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","Densification verification","Liquefaction screening"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner-associated account describes the compaction process and construction sequence. Site-specific CPT data and the complete foundation design package are not provided.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a field trial and acceptance programme for vibrocompaction of a reclaimed waterfront building plot.","inputs":["Use the source to define the treatment sequence and imported/backfill material interfaces.","Specify a study sand profile and groundwater level, then identify tests required before adopting design parameters."],"deliverables":["Compare trial-grid spacings using settlement and CPT-based acceptance criteria.","Develop treatment quantities, verification coverage and a response to refusal or poor improvement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should vibratory power records be supplemented with independent ground testing?","How do fines content and drainage affect the suitability of vibrocompaction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vibro-compaction at Palm Jumeirah","url":"https://www.theviewpalm.ae/en/museum/vibro-compaction","publisher":"The View at The Palm / project exhibition","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","publisher":"Wikimedia Commons / Imre Solt","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"palm-jumeirah.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/schematic"},{"id":"project-image","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg","kind":"project-image","fileName":"palm-jumeirah.jpg","mimeType":"image/jpeg","bytes":280492,"sha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","sourceId":"s2","license":"CC BY-SA 3.0","width":1229,"height":834,"credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","imageDate":"2008-05-08","evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/09/Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","downloadUrl":"/cases/palm-jumeirah/download/project-image","originalSha1":"9801565839b06dc5480f7e16e994dd5a0aeecc35","originalSha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"palm-jumeirah-capstone.md","mimeType":"text/markdown","bytes":2974,"sha256":"a3757f6fd38ceeed2ee732037f47ceea1e441f986a62f88dc5a160a9de2ded99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Palm Jumeirah viewed from a helicopter in May 2008.","caption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","width":1229,"height":834,"imageDate":"2008-05-08","imageDownloadAllowed":true},"figureCaption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":57,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":284654,"sourceCount":2,"url":"/cases/palm-jumeirah"}