{"id":"pebble-beach-bluff","title":"Pebble Beach Drive — coastal bluff stabilization","summary":"An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.","topics":["slopes","retaining-walls","coastal-offshore","seepage"],"country":"United States","region":"Crescent City, California","owner":"Del Norte County","year":2009,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Launched soil nails","Coastal slope drainage","Restricted-access construction"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The case describes nail arrangement, drainage galleries and installation adjustments. Its specialty nail system needs method-specific verification.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The case records a five-week construction period spanning December 2008 and January 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Construction observations and photographs are linked at the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare drainage and reinforcement alternatives for a coastal bluff supporting a road, including corrosion and erosion exposure.","inputs":["Extract the exploration description and installation constraints.","Identify shoreline loading and future erosion information needed beyond the case."],"deliverables":["Develop a stability/drainage concept and distinguish launched nails from drilled-and-grouted nails.","Specify a trial installation, acceptance testing and long-term inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Pebble Beach Drive slope stabilization","url":"https://www.geoinstitute.org/node/8373","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pebble-beach-bluff.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/schematic"},{"id":"project-image","title":"Pebble Beach Drive — coastal stabilization works","kind":"project-image","fileName":"pebble-beach-bluff-r13.jpg","mimeType":"image/jpeg","bytes":134722,"sha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":450,"credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","licenseUrl":"https://www.geoinstitute.org/node/8373","imageDate":null,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/SI1.jpg","originalSha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/pebble-beach-bluff/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pebble-beach-bluff-capstone.md","mimeType":"text/markdown","bytes":2696,"sha256":"3028e28553e93107e7a38993c995c67905c02bd14803be5a31eab41763f1ab69","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","caption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8373","width":600,"height":450,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":10,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3725,"sourceCount":1,"url":"/cases/pebble-beach-bluff"}