# Port of Brisbane — vacuum consolidation beside a marine park

Case reference year: 2009 | Location: Fisherman Islands, Queensland, Australia

A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Compare vacuum-assisted and fill-only preloading for an environmentally constrained soft-ground boundary.

### Inputs to assemble

- Extract the trial profile, drainage arrangement and cutoff function.
- List the settlement, pore-pressure and lateral-displacement observations needed to separate mechanisms.

### Deliverables

- Compare consolidation time and stability for vacuum-plus-fill versus higher surcharge.
- Specify vacuum-loss response, cutoff continuity tests and a monitoring plan at the sensitive boundary.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How would an undetected sand connection reduce the effective vacuum in the clay?
- Why must improved consolidation time be assessed alongside lateral movement?

## Published project information

### Design — partial

The owner, contractor and consultant paper records the trial design objectives, instrumentation and interpreted performance. Its successful trial does not establish identical behavior in every reclamation cell.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.

Credit: Nick-D
Image source: https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg
Image rights: CC BY-SA 4.0 — https://creativecommons.org/licenses/by-sa/4.0

## Sources

- Successful application of vacuum consolidation (Port of Brisbane, Menard and Coffey project authors; date not stated): https://rpsonline.com.sg/proceedings/9789810831240/html/GI125.php
- Performance and prediction of vacuum combined surcharge consolidation (Indraratna and project coauthors / ASCE; date not stated): https://ascelibrary.com/doi/10.1061/%28ASCE%29GT.1943-5606.0000519
- Port of Brisbane and Brisbane Airport June 2015.jpg — image and reuse license (Wikimedia Commons / Nick-D; 2015): https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.