# Port of Alaska — test piles and seismic waterfront foundations

Case reference year: 2020 | Location: Anchorage, Alaska, United States

Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a waterfront pile-test programme that answers structural, geotechnical and marine-environmental questions together.

### Inputs to assemble

- Extract the trial-pile purpose and installation/test sequence from the owner report.
- Identify tidal-silt cyclic behavior, offshore strengths and shear-wave velocity gaps described by the designer.

### Deliverables

- Compare pile capacity and drivability interpretations for a study wharf bent.
- Plan static/dynamic testing, cyclic material tests and underwater-noise verification.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can changing the installation method satisfy noise limits yet affect pile capacity?
- Why does an essential waterfront facility need deformation checks beyond ordinary axial resistance?

## Published project information

### Design — partial

The owner provides a test-pile report and the geotechnical consultant explains terminal investigation gaps. The programme-wide trial and terminal design are distinguished in the study brief.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.

Credit: U.S. Army Corps of Engineers, photographer not specified or unknown
Image source: https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing

## Sources

- Modernization test-pile programme and report (Don Young Port of Alaska; date not stated): https://www.portofalaska.com/modernization-project/test-pile-program-summary/
- Petroleum Cement Terminal geotechnical investigation (R&M Consultants; date not stated): https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal-geotechnical/
- Terminal engineering project account (R&M Consultants; date not stated): https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal/
- Anchorage Alaska aerial view.jpg — image and reuse license (Wikimedia Commons / U.S. Army Corps of Engineers, photographer not specified or unknown; 1999): https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.