{"id":"qinghai-tibet-railway","title":"Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost","summary":"Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.","topics":["cold-regions","earthworks","monitoring","problem-soils"],"country":"China","region":"Qinghai–Tibet Plateau","owner":"Qinghai–Tibet Railway","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Air-convection embankments","Thermal monitoring","Thaw deformation"],"documentationLevel":"monitoring-study","design":{"availability":"partial","summary":"The monitoring paper reports several embankment configurations. Later proposed reinforcement is research, not proof that every monitored section was reconstructed with that measure.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment cross-section for warm permafrost using both thermal and deformation performance.","inputs":["Extract the monitoring period and distinguish the compared crushed-rock arrangements.","Define climate, aspect and rock-layer permeability sensitivities for the study section."],"deliverables":["Compare seasonal cooling and thaw-depth trends under alternative geometries.","Develop maintenance checks for clogging, slope asymmetry and track-level movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a rock layer lose cooling effectiveness even when its thickness is unchanged?","Why should the warmest year and cumulative thermal trend both inform maintenance decisions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Cooling performance and deformation of railway embankments","url":"https://www.sciencedirect.com/science/article/pii/S0013795219312098","publisher":"Tai and coauthors / Engineering Geology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and reinforcement study","url":"https://pmc.ncbi.nlm.nih.gov/articles/PMC11471204/","publisher":"Research authors / open journal article","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lhassa-Xining railway.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","publisher":"Wikimedia Commons / This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"qinghai-tibet-railway.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/schematic"},{"id":"project-image","title":"Lhassa-Xining railway.JPG","kind":"project-image","fileName":"qinghai-tibet-railway.jpg","mimeType":"image/jpeg","bytes":577578,"sha256":"e3bdb64f0cac308615d1017bb64abcec0d6a428ad400ccf8d23332aaaef94bc0","sourceId":"s3","license":"CC0","width":1280,"height":961,"credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-05-14","evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Lhassa-Xining_railway.JPG","downloadUrl":"/cases/qinghai-tibet-railway/download/project-image","originalSha1":"e561258d5e03d572416a91865a11a4421aca973f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"qinghai-tibet-railway-capstone.md","mimeType":"text/markdown","bytes":3908,"sha256":"9fd34b9e382fbf6d1d0107977d066f9ff370d3eb2ecab7364cad29b308c04651","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Qinghai–Tibet railway route beyond Golmud.","caption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":961,"imageDate":"2012-05-14","imageDownloadAllowed":true},"figureCaption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":86,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582454,"sourceCount":3,"url":"/cases/qinghai-tibet-railway"}