{"id":"randle-reef","title":"Randle Reef — harbour sediment containment and final capping","summary":"Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.","topics":["geoenvironmental","coastal-offshore","retaining-walls","settlement"],"country":"Canada","region":"Hamilton Harbour, Ontario","owner":"Canada Water Agency and project partners","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sediment containment","Steel walls","Consolidation","Environmental capping"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The official project record identifies the staged remedy. The final cap is not labeled complete: the reviewed owner update schedules that phase for 2027.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The reviewed owner update schedules Stage 3 completion for 2027, subject to the additional structural work described there.","sourceIds":["s1"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a staged containment-cell concept that can receive dredged sediment and later support a capped working surface.","inputs":["Extract the containment, dredging and cap-stage functions from the owner record.","Define sediment compressibility, drainage and future surface loads as explicit study inputs."],"deliverables":["Compare wall stability and fill settlement during successive dredging stages.","Develop cap tolerances, consolidation monitoring and handover criteria for long-term operation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does sediment settlement affect cap grading and surface drainage?","Why is completion of contaminant placement different from completion of the containment facility?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Randle Reef remediation stages and status","url":"https://www.canada.ca/en/canada-water-agency/freshwater-ecosystem-initiatives/great-lakes/great-lakes-protection/areas-concern/hamilton-harbour/randle-reef.html","publisher":"Canada Water Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Randle Reef — project milestones and photographs","url":"https://randlereef.ca/","publisher":"Randle Reef project / Bay Area Restoration Council","year":2024,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"randle-reef.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/schematic"},{"id":"project-image","title":"Randle Reef — July 2024 project aerial","kind":"project-image","fileName":"randle-reef-r13.jpg","mimeType":"image/jpeg","bytes":148502,"sha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":410,"height":230,"credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","licenseUrl":"https://randlereef.ca/","imageDate":"2024-07","evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","transformations":"Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://randlereef.ca/images/Milestones/2024-07-01-RR-1.jpg","originalSha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/randle-reef/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"randle-reef-capstone.md","mimeType":"text/markdown","bytes":3111,"sha256":"4357e7687177934b826133161deabfbee508806634260af74dd729247c2ea234","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.","caption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://randlereef.ca/","width":410,"height":230,"imageDate":"2024-07","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":97,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","visualReview":"Inspected the complete published 410 × 230 image. It shows the actual containment cell with surrounding water, retaining perimeter and construction-stage fill. The image is not relabeled as a final-completion record.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4102,"sourceCount":2,"url":"/cases/randle-reef"}