{"id":"rion-antirion","title":"Rion–Antirion Bridge — seismic caissons on improved seabed","summary":"The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.","topics":["shallow-foundations","ground-improvement","seismic","coastal-offshore","lateral-foundations"],"country":"Greece","region":"Gulf of Corinth","owner":"Gefyra","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seabed inclusions","Caisson sliding","Seismic capacity design"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Designer accounts explain the seismic load-transfer concept, alternative selection and verification studies. Their inclusion terminology is retained because the caisson is not fixed to the inclusions.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The designer account describes an approximately €800 million overall project. It is not a foundation-package bill or a certified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The designer account reports completion in summer 2004 ahead of the contractual deadline.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate a gravity caisson on reinforced seabed with controlled sliding and uplift under earthquake loading.","inputs":["Extract the published soil layering, caisson geometry and reinforcement concept.","Use separate interface and reinforced-ground strengths; do not model the inclusions as connected piles."],"deliverables":["Check bearing, sliding and uplift for a defined seismic load envelope.","Compare alternative foundation concepts and propose validation by model tests and monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which load path is lost if the gravel layer is incorrectly modeled as a fixed connection?","How can controlled foundation movement reduce structural force while requiring displacement checks?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of Rion Antirion Bridge","url":"https://www.ice.org.uk/areas-of-interest/buildings-and-structures/design-and-construction-of-rion-antirion","publisher":"Bridge design team / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation design paper","url":"https://ascelibrary.org/doi/10.1061/40744%28154%297","publisher":"Alain Pecker / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","publisher":"Wikimedia Commons / Julien Seguinot from Lille, France","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rion-antirion.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/schematic"},{"id":"project-image","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg","kind":"project-image","fileName":"rion-antirion.jpg","mimeType":"image/jpeg","bytes":393534,"sha256":"a3d2e41eaadeb905afedcc04ba5700e30410d24dbf4cd468265faa4b86936bc9","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-09-30 15:33","evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9f/Rio-Antirrio_bridge_from_Peloponnese_%2850451233726%29.jpg","downloadUrl":"/cases/rion-antirion/download/project-image","originalSha1":"e79018f5e06ee63197783330d3fe440d7aa3cebb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rion-antirion-capstone.md","mimeType":"text/markdown","bytes":3295,"sha256":"e769c46de36c7f364d44c5e2ab1ce02b58a85a6298e8ea0522acc1691d78bc0c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Rion–Antirion Bridge viewed from the Peloponnese.","caption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2020-09-30 15:33","imageDownloadAllowed":true},"figureCaption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":53,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":397715,"sourceCount":3,"url":"/cases/rion-antirion"}