# Salesforce Tower — staged excavation and artesian-pressure control

Case reference year: 2018 | Location: San Francisco, United States

The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Coordinate nested excavation stages where the deepest core excavation extends below the surrounding basement.

### Inputs to assemble

- Extract the reported support components and their excavation-stage relationships.
- Define study water pressures and soil strengths and identify which require field confirmation.

### Deliverables

- Check basal uplift/heave and wall movements at each excavation stage.
- Draw load-transfer interfaces between the braced perimeter, circular ring and plaza support.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which stage creates the most adverse hydraulic gradient below the excavation?
- What happens to support loads when a local deeper excavation is opened inside a braced box?

## Published project information

### Design — partial

The engineer-of-record account identifies installed systems and construction stages. It does not publish the full calculation package or groundwater time series.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.

Credit: Dllu
Image source: https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg
Image rights: CC BY-SA 4.0 — https://creativecommons.org/licenses/by-sa/4.0

## Sources

- Salesforce Tower excavation support (Simpson Gumpertz & Heger, excavation engineer of record; date not stated): https://www.sgh.com/project/salesforce-tower-excavation-support/
- Salesforce Tower Construction, San Francisco.jpg — image and reuse license (Wikimedia Commons / Dllu; 2017): https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.