{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"}