# Shanghai Tower — excavation compensation and pile–raft interaction

Case reference year: 2015 | Location: Shanghai, China

Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.

### Inputs to assemble

- Extract the construction-stage loads and compressible layers described in the papers.
- Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading.

### Deliverables

- Compare a compensated-foundation calculation with a simplified interacting pile–raft model.
- Propose a pile-stiffness distribution and explain its effect on raft curvature.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Can apparent compensation of total stress justify ignoring differential settlement?
- Which measured response would reveal an overly stiff pile-group assumption?

## Published project information

### Design — partial

The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.

Credit: Stefan Fussan
Image source: https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Foundation re-analysis using compensated pile foundation theory (Project researchers / The Structural Design of Tall and Special Buildings; date not stated): https://onlinelibrary.wiley.com/doi/10.1002/tal.1087
- Pile-raft foundation optimization analysis of Shanghai Tower (Zeng Chaojie / Soil Engineering and Foundation; date not stated): https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243
- Shanghai - Shanghai Tower - 0001.jpg — image and reuse license (Wikimedia Commons / Stefan Fussan; 2016): https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.