{"id":"shanghai-tower","title":"Shanghai Tower — excavation compensation and pile–raft interaction","summary":"Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.","topics":["deep-foundations","settlement","excavation","monitoring"],"country":"China","region":"Shanghai","owner":"Shanghai Tower Construction and Development","year":2015,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Excavation compensation","Variable stiffness"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.","inputs":["Extract the construction-stage loads and compressible layers described in the papers.","Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading."],"deliverables":["Compare a compensated-foundation calculation with a simplified interacting pile–raft model.","Propose a pile-stiffness distribution and explain its effect on raft curvature.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can apparent compensation of total stress justify ignoring differential settlement?","Which measured response would reveal an overly stiff pile-group assumption?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation re-analysis using compensated pile foundation theory","url":"https://onlinelibrary.wiley.com/doi/10.1002/tal.1087","publisher":"Project researchers / The Structural Design of Tall and Special Buildings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pile-raft foundation optimization analysis of Shanghai Tower","url":"https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243","publisher":"Zeng Chaojie / Soil Engineering and Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Shanghai - Shanghai Tower - 0001.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","publisher":"Wikimedia Commons / Stefan Fussan","year":2016,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"shanghai-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/schematic"},{"id":"project-image","title":"Shanghai - Shanghai Tower - 0001.jpg","kind":"project-image","fileName":"shanghai-tower.jpg","mimeType":"image/jpeg","bytes":714199,"sha256":"a540e70593ff3ea46a5baca90d32d4970546a3250d424431e2b792b02e6b7495","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":2114,"credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2016-09-18","evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e0/Shanghai_-_Shanghai_Tower_-_0001.jpg","downloadUrl":"/cases/shanghai-tower/download/project-image","originalSha1":"fbf6b991ef2d29b0baf093451432884e609fef5a","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"shanghai-tower-capstone.md","mimeType":"text/markdown","bytes":3209,"sha256":"7ddd952b24548584f1328900dafc4c9f5aedfac7b7cc92766795ff25ac33f2d7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Shanghai Tower in Shanghai.","caption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":2114,"imageDate":"2016-09-18","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":50,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":718607,"sourceCount":3,"url":"/cases/shanghai-tower"}