# SMART Tunnel — tunnelling through urban karst

Case reference year: 2007 | Location: Kuala Lumpur, Malaysia

The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Plan ground investigation and treatment for a tunnel encountering pinnacles, cavities and variable cover beneath a city.

### Inputs to assemble

- Extract the reported karst features and the purpose of each grouting method.
- Specify investigation coverage at shafts, interventions and transitions rather than uniform spacing alone.

### Deliverables

- Develop face-pressure and groundwater-control concepts for mixed ground.
- Prepare a cavity/sinkhole response plan with survey triggers and treatment verification.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can groundwater drawdown cause a surface collapse away from the tunnel face?
- Which evidence separates a treatable local void from a larger connected karst system?

## Published project information

### Design — partial

The primary construction accounts explain the selected methods and localized treatment purposes. They do not establish that karst uncertainty can be removed by one uniform grouting grid.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The builder identifies operation from 2007; the page is a project history rather than a detailed monthly programme.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.

Credit: Azreey
Image source: https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG
Image rights: CC BY-SA 4.0 — https://creativecommons.org/licenses/by-sa/4.0

## Sources

- SMART construction and geology (SMART project; date not stated): https://www.smarttunnel.com.my/construction/print_project_construction.htm
- Ground-treatment contractor case (Keller; date not stated): https://www.kellerasean.com/projects/storm-water-management-and-road-tunnel
- Builder project record (Gamuda; date not stated): https://gamuda.com/our-expertise/engineering-construction/stormwater-management-and-road-tunnel-smart/
- KL-SMARTtunnelentrance.JPG — image and reuse license (Wikimedia Commons / Azreey; 2007): https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.