{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"}