# Sydney Olympic Park — engineered waste mounds and leachate management

Case reference year: 2022 | Location: Homebush Bay, New South Wales, Australia

Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a post-remediation management plan that keeps recreational land use compatible with waste containment.

### Inputs to assemble

- Map the relationship between waste mounds, drainage and treatment from the owner description.
- Identify obligations in the regulator’s ongoing maintenance order.

### Deliverables

- Prepare a leachate water balance with wet and dry season scenarios.
- Specify cap inspections, settlement surveys and action limits at public-use interfaces.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can changing irrigation practice affect both vegetation and leachate generation?
- Which engineering responsibilities persist after a site opens as a public park?

## Published project information

### Design — partial

The owner explains the treatment strategy and the regulator specifies ongoing management obligations. Parkland use does not remove containment and monitoring duties.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

The authority and regulator describe ongoing containment management rather than an unrestricted clean-soil site.

## Project image

Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.

Credit: YellowMonkey
Image source: https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Landfill leachate treatment (Sydney Olympic Park Authority; date not stated): https://www.sydneyolympicpark.nsw.gov.au/parklands/sustainability/innovative-landfill-waste-water-treatment
- Ongoing maintenance order amendment (NSW Environment Protection Authority; date not stated): https://app.epa.nsw.gov.au/resources/clm/docs/html/n20224440.htm
- Sydney Olympic Park, New South Wales (aerial view, 2010).jpg — image and reuse license (Wikimedia Commons / YellowMonkey; 2010): https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.