# Tempe Marketplace — foundations over former landfill

Case reference year: 2015 | Location: Tempe, Arizona, United States

The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.

### Inputs to assemble

- Extract the source’s treatment energy, grid and verification approach.
- Identify gas, contamination and decomposable-waste data absent from the geotechnical summary.

### Deliverables

- Compare foundations on treated ground with an alternative deep-foundation option.
- Prepare a trial-pad programme, vibration limits and residual-settlement allowances.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The case gives separate treatment passes for general areas and building zones and describes plate-load verification.

### Cost information — partial

Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

Plate-load and vibration monitoring are described; raw test datasets are not supplied.

## Project image

Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.

Credit: Cygnusloop99
Image source: https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Tempe Marketplace, Tempe, AZ (ASCE Geo-Institute / named case-history author; 2023): https://www.geoinstitute.org/node/16274