{"id":"teton-dam","title":"Teton Dam — internal erosion and first-filling investigation","summary":"The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.","topics":["dams-levees","seepage","rock","site-investigation"],"country":"United States","region":"Eastern Idaho","owner":"US Bureau of Reclamation","year":1976,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Internal erosion","Filters and contacts","First-filling surveillance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The official archive provides the original design/foundation investigation context and the 1976 failure report; the dam was not rebuilt.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Failure occurred on 5 June 1976; the independent panel report was submitted in December 1976.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The official archive links the investigation and contemporary photographs; there is no completed replacement-dam record.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate alternative core/filter and foundation-treatment concepts using the investigation as a forensic reference, without treating a classroom redesign as an approved remedy.","inputs":["Extract foundation geology, core/filter arrangement and reservoir-filling observations.","Separate contemporary records from later interpretations of the failure mechanism."],"deliverables":["Prepare a potential-failure-mode analysis and a filtered-contact concept.","Design a first-filling monitoring and escalation plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Teton Dam history and investigation archive","url":"https://www.usbr.gov/pn/snakeriver/dams/uppersnake/teton/","publisher":"Bureau of Reclamation","year":1976,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","publisher":"Wikimedia Commons / Department of the Interior. Bureau of Reclamation. Denver Office. 3/4/1988","year":1976,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"teton-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/schematic"},{"id":"project-image","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg","kind":"project-image","fileName":"teton-dam.jpg","mimeType":"image/jpeg","bytes":343519,"sha256":"ee45a14882d8e40ef7cdb8d2ece02d9b5374b2d05f99d4b1b102ea2a0eeda844","sourceId":"s2","license":"Public domain","width":1280,"height":1343,"credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","imageDate":"1976-06-05","evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0c/Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","downloadUrl":"/cases/teton-dam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"teton-dam-capstone.md","mimeType":"text/markdown","bytes":3122,"sha256":"b5d2ac5ede4ca9a488bd21b78156a925a2c65879cecce063d5ca5c2181a91114","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The breach of Teton Dam, June 5, 1976.","caption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","width":1280,"height":1343,"imageDate":"1976-06-05"},"figureCaption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","qualityNotes":["This is a failure-analysis case, not a successfully completed design example."],"checked":"2026-11-22","curatedOrder":25,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":347626,"sourceCount":2,"url":"/cases/teton-dam"}