{"id":"texas-sh6-sh21","title":"Texas SH 6 and SH 21 — expansive-subgrade distress","summary":"A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.","topics":["problem-soils","laboratory-testing","earthworks","site-investigation"],"country":"United States","region":"Texas","owner":"Texas Department of Transportation / Texas A&M","year":1996,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Expansive subgrade","Moisture/strength characterization","Treatment selection"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final research report covers site investigation, interpretation and treatment recommendations; the public catalog alone is not a rehabilitation plan set.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"A final research report is publicly indexed; complete construction records are not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a subgrade investigation and rehabilitation alternatives study for a selected documented pavement section.","inputs":["Extract one site’s profile, moisture and laboratory data from the final report.","Keep the two highway sections distinct when comparing properties and distress."],"deliverables":["Prepare a parameter register, moisture/heave mechanism assessment and test matrix.","Compare a moisture barrier, soil replacement and a verified stabilizer treatment.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Investigation of swelling clay soils in subgrades of SH 6 and SH 21","url":"https://rosap.ntl.bts.gov/view/dot/84762","publisher":"TxDOT / Texas A&M","year":1996,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"texas-sh6-sh21.svg","mimeType":"image/svg+xml","bytes":1074,"sha256":"f31305ba349170d998041ee804cfc6952d08a61de199d40088aca881bad4100f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/schematic"},{"id":"project-image","title":"Texas SH 6 — pavement distress over swelling clay","kind":"project-image","fileName":"texas-sh6-sh21-r13.png","mimeType":"image/png","bytes":274228,"sha256":"0cd4b7b8af15bdf841f4bfb2310c699fd7a2209492d7e470b1dcec98ca4aa54d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":701,"height":469,"credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","imageDate":"1996","evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","transformations":"Rendered the original Figure 6 photograph region from the scanned report page. Surrounding page margins and caption excluded; no alteration, reconstruction, or retouching within the photograph.","originalUrl":"https://static.tti.tamu.edu/tti.tamu.edu/documents/2965-1F.pdf","originalSha256":"8ca2867a7d79f743350f9ac93847c2c1cd02eec21a912b3b924cf8f25996008d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/texas-sh6-sh21/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"texas-sh6-sh21-capstone.md","mimeType":"text/markdown","bytes":2803,"sha256":"6dc6b1867827ec8c1bb1abebd7ac50b29e8c78784634e9d27226dbdd57d3ef70","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","caption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","width":701,"height":469,"imageDate":"1996","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":40,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3877,"sourceCount":1,"url":"/cases/texas-sh6-sh21"}