{"id":"trans-alaska-pipeline","title":"Trans-Alaska Pipeline — thermally stabilized supports in permafrost","summary":"The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.","topics":["cold-regions","deep-foundations","monitoring","problem-soils"],"country":"United States","region":"Alaska","owner":"Alyeska Pipeline Service Company","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Thermosyphons","Thaw settlement","Thermal piles","Infrared surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources explain design modes and thermal monitoring. They do not justify assuming that every support experiences the same ground temperature or ice content.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The sources describe an operating maintenance system and ongoing observations, not a once-only completed cooling treatment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an elevated pipe support whose foundation must remain stable as the seasonal thermal regime changes.","inputs":["Distinguish thaw-stable and thaw-unstable ground and identify the operator’s design modes.","Define a study soil-ice profile, climate series and support load using clearly stated assumptions."],"deliverables":["Compare thaw-settlement risk for untreated and passively cooled supports.","Prepare heat-pipe inspection, performance assessment and repair priorities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is a foundation’s thermal condition as important as its initial bearing capacity?","Which observations distinguish a failed heat pipe from a change in regional ground temperature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Permafrost and pipeline design modes","url":"https://alyeska-pipe.com/environmental-protection/","publisher":"Alyeska Pipeline Service Company","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Guide to permafrost and pipeline thermal supports","url":"https://dggs.alaska.gov/webpubs/dggs/gb/text/gb011.pdf","publisher":"Alaska Division of Geological & Geophysical Surveys","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Pipeline vertical support member.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","publisher":"Wikimedia Commons / JKBrooks85","year":2009,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"trans-alaska-pipeline.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/schematic"},{"id":"project-image","title":"Pipeline vertical support member.jpg","kind":"project-image","fileName":"trans-alaska-pipeline.jpg","mimeType":"image/jpeg","bytes":276864,"sha256":"95af32a5a9e743df4620352815794b8e849ecacf42f144afd7539bfb960faf59","sourceId":"s3","license":"Public domain","width":1280,"height":1786,"credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","imageDate":"2009-07-15","evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/7c/Pipeline_vertical_support_member.jpg","downloadUrl":"/cases/trans-alaska-pipeline/download/project-image","originalSha1":"d00ccb10f81ff141b64657c56034afc9de8df237","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"trans-alaska-pipeline-capstone.md","mimeType":"text/markdown","bytes":3223,"sha256":"ec3686dad92cdeee5d12b99ad4f7a2c3957dd463a9f24f58d97ff6e6ea2535eb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators.","caption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","width":1280,"height":1786,"imageDate":"2009-07-15","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":85,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":281055,"sourceCount":3,"url":"/cases/trans-alaska-pipeline"}