# Transbay Transit Center — deep excavation beside existing foundations

Case reference year: 2010 | Location: San Francisco, United States

The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a deep-excavation risk assessment for a transit box bordered by loaded foundations in compressible urban deposits.

### Inputs to assemble

- Extract the authority’s proposed testing objectives and soil profile descriptions.
- Identify neighboring foundation levels and the movement paths that excavation could influence.

### Deliverables

- Compare wall stiffness, brace staging and groundwater control using an explicit study section.
- Write a trial-shaft verification plan and a monitoring-trigger matrix for adjacent properties.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which test result could change the proposed soil-improvement method before production?
- How do drawdown settlement and wall-deflection settlement require different monitoring?

## Published project information

### Design — partial

The public testing scope and meeting records describe design-stage reasoning. They are not the final as-built shoring design or a finding about responsibility for neighboring building movement.

### Cost information — partial

The testing-scope record discusses a reduced test programme within a $5 million request. This is a proposed testing allocation, not the transit center’s final foundation cost.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.

Credit: Jdelx
Image source: https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Geotechnical shoring wall testing scope (Transbay Joint Powers Authority / Arup; date not stated): https://www.tjpa.org/media/30638/download?inline=
- Shoring and excavation presentation record (Transbay Joint Powers Authority; date not stated): https://www.tjpa.org/media/36745/download?inline=
- Transbay Transit Center under construction, Spring 2013.png — image and reuse license (Wikimedia Commons / Jdelx; 2013): https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.