Develop a lightweight ramp concept while preserving adjacent road and rail service.

### Inputs to assemble

- Use the owner’s site description and identify missing foundation-soil data.
- Set an explicit study profile, load case and allowable movement with instructor approval.

### Deliverables

- Check foundation stress, settlement, block compression and groundwater uplift.
- Draw block arrangement, pavement separation and lateral protection details.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The owner update documents ramp construction in August 2023.

### Completion and records — partial

The source includes construction photographs; complete as-built drawings were not established.

## Project image

Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.

Credit: Utah Department of Transportation (UDOT)
Image source: https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/
Image rights: UDOT public reuse with attribution — social-media policy — https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf

## Sources

- UDOT uses Styrofoam blocks to build freeway ramp in Davis County (UDOT; 2023): https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.