{"id":"west-davis-geofoam","title":"West Davis Highway ramp — lightweight fill beside live transport","summary":"UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.","topics":["ground-improvement","settlement","earthworks","delivery"],"country":"United States","region":"Farmington, Utah","owner":"Utah Department of Transportation","year":2023,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Settlement control","Construction access"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner update documents ramp construction in August 2023.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source includes construction photographs; complete as-built drawings were not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a lightweight ramp concept while preserving adjacent road and rail service.","inputs":["Use the owner’s site description and identify missing foundation-soil data.","Set an explicit study profile, load case and allowable movement with instructor approval."],"deliverables":["Check foundation stress, settlement, block compression and groundwater uplift.","Draw block arrangement, pavement separation and lateral protection details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"UDOT uses Styrofoam blocks to build freeway ramp in Davis County","url":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","publisher":"UDOT","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-davis-geofoam.svg","mimeType":"image/svg+xml","bytes":1799,"sha256":"e23761dbae30acfd1a743186545c5dcb2378a1245850347956435a393d209bfe","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/schematic"},{"id":"project-image","title":"West Davis Highway geofoam ramp — UDOT aerial photograph","kind":"project-image","fileName":"west-davis-geofoam.jpg","mimeType":"image/jpeg","bytes":410515,"sha256":"ab0b77da1950e4c96176524133fdba24a8ba723c6ae986fac408e5789d53dd3f","sourceId":"s1","license":"UDOT public reuse with attribution — social-media policy","width":1536,"height":1152,"credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","imageDate":null,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","transformations":"Unmodified image bytes from UDOT’s 1536-pixel file; responsive display sizing only.","downloadUrl":"/cases/west-davis-geofoam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-davis-geofoam-capstone.md","mimeType":"text/markdown","bytes":2842,"sha256":"b5fb2c304589779ef896527dbaa582a8964ff846f3a2fbf5fcc79dbbaf04c8e9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the West Davis Highway geofoam ramp under construction beside live transport routes.","caption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","license":"UDOT public reuse with attribution — social-media policy","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","width":1536,"height":1152,"imageDate":null},"figureCaption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":4,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":415156,"sourceCount":1,"url":"/cases/west-davis-geofoam"}