# Woodrow Wilson Bridge — foundation selection and testing

Case reference year: 2008 | Location: Potomac River, Virginia–Maryland, United States

Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.

### Inputs to assemble

- Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.
- Record separately the design spectrum and the soil profile used in the foundation response study.

### Deliverables

- Develop axial/group and lateral-response checks for a selected pier.
- Compare two foundation alternatives with construction plant, testing and navigational constraints.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

The 2008 paper provides a later construction-stage foundation account.

## Project image

Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.

Credit: Doc Searls from Santa Barbara, USA
Image source: https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg
Image rights: CC BY 2.0 — https://creativecommons.org/licenses/by/2.0

## Sources

- Foundation optimization and design for replacement of the Woodrow Wilson Bridge (Project authors / Missouri S&T Scholars’ Mine; 2004): https://scholarsmine.mst.edu/icchge/5icchge/session09/6/
- New I-95 Woodrow Wilson Bridge Foundations (Project authors / Missouri S&T Scholars’ Mine; 2008): https://scholarsmine.mst.edu/icchge/6icchge/session08/6/
- Woodrow Wilson Bridge aerial 2012.jpg — image and reuse license (Wikimedia Commons / Doc Searls from Santa Barbara, USA; 2012): https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.