{"id":"fhwa-hrt-12-051","title":"FHWA — GRS-IBS guide specifications","summary":"Prepare construction specifications for geosynthetic-reinforced-soil integrated bridge systems.","topics":["geosynthetics","construction","retaining"],"issuer":"Federal Highway Administration","documentType":"Design manual","designation":"FHWA-HRT-12-051","edition":"August 2012","year":2012,"jurisdiction":"United States — federal transportation guidance","language":"English","status":"Published reference; confirm the governing contract, jurisdiction and applicable revisions.","access":"local","scope":"Sample construction guide specifications for geosynthetic reinforced soil integrated bridge systems (GRS-IBS). Organizes material requirements, submittals, excavation, reinforced fill and facing construction, bridge placement, tolerances and quality assurance. Adapt the sample to the project and owner specification; it is intended to accompany the GRS-IBS implementation guidance.","relatedMethods":[],"sources":[{"id":"publisher","title":"Sample Guide Specifications for Construction of Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/12051/12051.pdf","publisher":"FHWA","year":2012,"access":"official-free","license":"U.S. Government / FHWA technical publication; original public-release document with embedded attribution and third-party notices retained.","checkedAt":"2026-11-22","notes":""},{"id":"index","title":"FHWA geotechnical publications","url":"https://www.fhwa.dot.gov/engineering/Geotech/library_listing.cfm","publisher":"FHWA","year":null,"access":"official-free","license":"Official public access; separate redistribution permission not established.","checkedAt":"2026-11-22","notes":""}],"assets":[{"id":"document","title":"Complete published PDF","fileName":"fhwa-hrt-12-051.pdf","mimeType":"application/pdf","bytes":809557,"sha256":"5bf8a5584d4092b5c84b30f03d65e3f7a064ccc8f320aae8dfc00ae41e864f26","sourceId":"publisher","license":"U.S. Government / FHWA technical publication; original public-release document with embedded attribution and third-party notices retained.","pages":36,"originalUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/12051/12051.pdf","textLayer":true,"downloadUrl":"/docs/fhwa-hrt-12-051/download/document"},{"id":"document-preview","kind":"document-cover","title":"Document first-page preview","fileName":"fhwa-hrt-12-051.jpg","mimeType":"image/jpeg","bytes":49487,"sha256":"eeab148fa5d033798458456427b3d7de4ef6b9c53df0825d42a02e94b1d5deec","width":588,"height":760,"sourceId":"publisher","sourceAssetId":"document","sourceSha256":"5bf8a5584d4092b5c84b30f03d65e3f7a064ccc8f320aae8dfc00ae41e864f26","sourcePage":1,"license":"Bibliographic first-page preview. Original publisher and third-party credits retained in the linked complete document.","downloadUrl":"/docs/fhwa-hrt-12-051/download/document-preview"}],"verifiedAt":"2026-11-22","localCopyNote":"Original complete FHWA PDF retained without content modification; source and third-party notices remain part of the document.","rightsEvidence":"Original FHWA government technical publication obtained from its official public publication repository, retained as issued with source credits.","cover":{"assetId":"document-preview","kind":"document-cover","alt":"Published first page of FHWA — GRS-IBS guide specifications","sourceAssetId":"document","page":1,"width":588,"height":760,"caption":"First-page preview of the linked published document.","credit":"Federal Highway Administration"},"url":"/docs/fhwa-hrt-12-051"}