{"id":"usbr-ds13-10","title":"USBR DS 13, Chapter 10 — Embankment Construction","summary":"Specify and control embankment placement, moisture and compaction.","topics":["dams","earthworks","construction"],"issuer":"Bureau of Reclamation","documentType":"Design standard chapter","designation":"DS 13, Chapter 10","edition":"May 2012","year":2012,"jurisdiction":"United States — Reclamation dams","language":"English","status":"Published reference; confirm the governing contract, jurisdiction and applicable revisions.","access":"local","scope":"Specify and control embankment placement, moisture and compaction. Published as a separate chapter within Design Standards No. 13, Embankment Dams.","relatedMethods":[],"sources":[{"id":"publisher","title":"USBR DS 13, Chapter 10 — Embankment Construction","url":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-10.pdf","publisher":"Bureau of Reclamation","year":2012,"access":"official-free","license":"U.S. Government work; original published document with embedded third-party credits retained.","checkedAt":"2026-11-22","notes":"Chapter and date verified in Reclamation’s Design Standards table; original government publication retained without modification."}],"assets":[{"id":"document","title":"Complete published PDF","fileName":"usbr-ds13-10.pdf","mimeType":"application/pdf","bytes":4766946,"sha256":"ea4d075cc5127377a9d31d5f4bae9aa85f24d825db0b8eb41a9cea0593cb1886","sourceId":"publisher","license":"U.S. Government work; original published document with embedded third-party credits retained.","pages":110,"originalUrl":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-10.pdf","downloadUrl":"/docs/usbr-ds13-10/download/document"},{"id":"document-preview","kind":"document-cover","title":"Document first-page preview","fileName":"usbr-ds13-10.jpg","mimeType":"image/jpeg","bytes":25710,"sha256":"ed291a8e028385617ffab47c86933e9f245955997655a1f43ddc6e2ec6e78ce3","width":588,"height":760,"sourceId":"publisher","sourceAssetId":"document","sourceSha256":"ea4d075cc5127377a9d31d5f4bae9aa85f24d825db0b8eb41a9cea0593cb1886","sourcePage":1,"license":"Bibliographic first-page preview. Original publisher and third-party credits retained in the linked complete document.","downloadUrl":"/docs/usbr-ds13-10/download/document-preview"}],"verifiedAt":"2026-11-22","localCopyNote":"Original publisher PDF retained without content modification; retain all source and third-party credits.","cover":{"assetId":"document-preview","kind":"document-cover","alt":"Published first page of USBR DS 13, Chapter 10 — Embankment Construction","sourceAssetId":"document","page":1,"width":588,"height":760,"caption":"First-page preview of the linked published document.","credit":"Bureau of Reclamation"},"url":"/docs/usbr-ds13-10"}