{"id":"usbr-ds13-17","title":"USBR DS 13, Chapter 17 — Soil-Cement Slope Protection","summary":"Specify soil-cement slope protection and construction quality control.","topics":["dams","ground-improvement","slopes"],"issuer":"Bureau of Reclamation","documentType":"Design standard chapter","designation":"DS 13, Chapter 17","edition":"August 2013","year":2013,"jurisdiction":"United States — Reclamation dams","language":"English","status":"Published reference; confirm the governing contract, jurisdiction and applicable revisions.","access":"local","scope":"Provides design and construction guidance for soil-cement protection on embankment-dam slopes. Covers material selection, mixture proportioning, durability, placement and quality control. This is the complete August 2013 chapter within Design Standards No. 13, Embankment Dams; consult the related embankment and protective-filter chapters for the overall dam system.","relatedMethods":[],"sources":[{"id":"publisher","title":"USBR DS 13, Chapter 17 — Soil-Cement Slope Protection","url":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-17.pdf","publisher":"Bureau of Reclamation","year":2013,"access":"official-free","license":"U.S. Government work; original published document with embedded third-party credits retained.","checkedAt":"2026-11-22","notes":"Chapter and date verified in Reclamation’s Design Standards table; original government publication retained without modification."}],"assets":[{"id":"document","title":"Complete published PDF","fileName":"usbr-ds13-17.pdf","mimeType":"application/pdf","bytes":4892473,"sha256":"da1839015883659562d7d8c08814cf916f4b23b28019c16a169de99d0244fbb1","sourceId":"publisher","license":"U.S. Government work; original published document with embedded third-party credits retained.","pages":70,"originalUrl":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-17.pdf","textLayer":true,"downloadUrl":"/docs/usbr-ds13-17/download/document"},{"id":"document-preview","kind":"document-cover","title":"Document first-page preview","fileName":"usbr-ds13-17.jpg","mimeType":"image/jpeg","bytes":24835,"sha256":"e8b78ba88e7156ed6e643c60886196ae367edf1cbf51110355f140580f9148b3","width":588,"height":760,"sourceId":"publisher","sourceAssetId":"document","sourceSha256":"da1839015883659562d7d8c08814cf916f4b23b28019c16a169de99d0244fbb1","sourcePage":1,"license":"Bibliographic first-page preview. Original publisher and third-party credits retained in the linked complete document.","downloadUrl":"/docs/usbr-ds13-17/download/document-preview"}],"verifiedAt":"2026-11-22","localCopyNote":"Original complete publisher PDF retained without content modification; retain source and third-party credits.","rightsEvidence":"Original agency-authored federal technical publication obtained from the official agency distribution service; all published source credits retained.","cover":{"assetId":"document-preview","kind":"document-cover","alt":"Published first page of USBR DS 13, Chapter 17 — Soil-Cement Slope Protection","sourceAssetId":"document","page":1,"width":588,"height":760,"caption":"First-page preview of the linked published document.","credit":"Bureau of Reclamation"},"url":"/docs/usbr-ds13-17"}