Mud Creek, Highway 1 — landslide mapping and road recovery

Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.

Soil slopes and landslidesCoastal and offshore foundationsMonitoring and observational designEarthworks and pavement subgrades
The Mud Creek landslide on California’s Big Sur coast in May 2017.
The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.Pacific Coastal and Marine Science Center · Image source · Public domain

Project evidence

Design & engineering

Partial record

USGS provides the investigation and monitoring context; the linked science page is not the final road-reconstruction design.

Sources: s1 · s2

Cost & estimating

Partial record

NASA’s 2019 account cites $54 million in road repairs; a detailed final estimate is not attached.

Sources: s2

Schedule & construction

Partial record

The failure occurred on 20 May 2017; source publications document pre/post-event observations.

Sources: s1 · s2

Completion & performance

Partial record

Research observations are linked; final road as-built documents were not established.

Sources: s1 · s2

Engineering methods

Change detectionCoastal slope behaviourRoad-alignment alternatives

Suggested teaching exercise

Capstone project brief

Develop a road-recovery alternatives study using mapped change and a clearly defined stability/erosion investigation plan.

Starting information & inputs

  • Identify the source surveys, coordinate reference, acquisition dates and remaining moving areas.
  • Keep differing published volume estimates tied to their methods and dates.

Suggested deliverables

  • Create a change-map interpretation and preliminary geotechnical ground model.
  • Compare realignment and reconstruction concepts with residual movement and coastal erosion risks.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.