Bowman Road Bridge — reinforced-soil abutments
The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
117 of 117 project case studies
The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.
The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.
Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.
UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.
Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.
A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.
A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.
The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.
A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.
The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.
Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.
A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.
A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.
The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.
The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.
Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Bowman Road Bridge — reinforced-soil abutments | Design and construction | Defiance CountyDefiance County, Ohio | 2005 | Original documents |
| Founders/Meadows Bridge — footings on reinforced soil | Design and construction | Colorado Department of TransportationCastle Rock, Colorado | 1999 | Study materials |
| I-15 reconstruction — soft-ground embankments and geofoam | Design and construction | Utah Department of TransportationSalt Lake City, Utah | 2001 | Study materials |
| West Davis Highway ramp — lightweight fill beside live transport | Design and construction | Utah Department of TransportationFarmington, Utah | 2023 | Study materials |
| Woodrow Wilson Bridge — foundation selection and testing | Design and construction | Virginia DOT / Maryland State Highway AdministrationPotomac River, Virginia–Maryland | 2008 | Study materials |
| Virginia Route 288 — drilled-shaft quality evaluation | Construction quality and testing | Virginia Department of TransportationRichmond region, Virginia | 2004 | Study materials |
| New Jersey Turnpike bridges — micropile underpinning | Rehabilitation | New Jersey highway agencies; see sourceNew Jersey | 2008 | Study materials |
| US 26/89, Snake River Canyon — micropile slope stabilization | Rehabilitation | Wyoming Department of TransportationWyoming | 1997 | Study materials |
| River Road, Tucson — tall soil-nailed cuts | Design and construction | Pima County Department of TransportationPima County, Arizona | 2004 | Study materials |
| Pebble Beach Drive — coastal bluff stabilization | Rehabilitation | Del Norte CountyCrescent City, California | 2009 | Study materials |
| US 14 near Nicollet — preload and vertical drains | Design and construction | Minnesota Department of TransportationNicollet, Minnesota | 2016 | Study materials |
| Hugh K. Leatherman Terminal — vertical-drain installation control | Design and construction | South Carolina State Ports AuthorityCharleston, South Carolina | 2018 | Study materials |
| Olyphant distribution centre — variable mine-spoil improvement | Design and construction | D&L RealtyOlyphant, Pennsylvania | 2022 | Study materials |
| Tempe Marketplace — foundations over former landfill | Redevelopment | Owner not stated in reviewed caseTempe, Arizona | 2015 | Study materials |
| JFK hangar expansion — liquefaction mitigation by compaction | Design and construction | Airport project owner not stated in reviewed caseQueens, New York | 1999 | Study materials |
| Prudential Center — shallow foundations after improvement | Redevelopment | New Jersey DevilsNewark, New Jersey | 2006 | Study materials |
| Boston Central Artery/Tunnel — deep mixing and ground movement | Design and construction | Massachusetts highway agenciesBoston, Massachusetts | 2006 | Study materials |
| Seattle SR 99 tunnel — soft-ground tunnelling and settlement | Design and construction | Washington State Department of TransportationSeattle, Washington | 2019 | Study materials |
| Crossrail Farringdon — compensation grouting near existing assets | Design and construction | CrossrailLondon, England | 2016 | Study materials |
| Wolf Creek Dam — karst-foundation cutoff wall | Rehabilitation | US Army Corps of EngineersJamestown, Kentucky | 2013 | Study materials |
| Center Hill Dam — grouting, cutoff wall and stabilizing berm | Rehabilitation | US Army Corps of EngineersDeKalb County, Tennessee | 2020 | Study materials |
| Herbert Hoover Dike — seepage barriers and structure replacement | Rehabilitation | US Army Corps of EngineersLake Okeechobee, Florida | 2023 | Original documents |
| Folsom auxiliary spillway — rock excavation and foundation preparation | Design and construction | USACE / Bureau of ReclamationFolsom, California | 2017 | Study materials |
| Oroville spillway recovery — erosion-resistant foundation reconstruction | Rehabilitation | California Department of Water ResourcesOroville, California | 2018 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.