Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

11 of 117 project case studies

Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.

Pima County Department of Transportation · 2004

River Road, Tucson — tall soil-nailed cuts

Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.

Retaining walls and anchorsExcavation supportSite investigation
The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.

Tennessee Department of Transportation · 2010

US 64 Ocoee Gorge — emergency rockslide stabilization

Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.

Rock slopes and foundationsSoil slopes and landslidesRetaining walls and anchors
Salesforce Tower during construction in San Francisco.

Salesforce Tower development team · 2018

Salesforce Tower — staged excavation and artesian-pressure control

The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.

Excavation supportDewatering and groundwaterGround improvement
Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.

Thames Water · 2017

Lee Tunnel — diaphragm-wall shafts in water-bearing chalk

Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.

Tunnels and underground worksExcavation supportDewatering and groundwater
Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995.

Port of Kobe / Japanese port researchers · 1995

Kobe Port — quay-wall displacement during liquefaction

Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.

Earthquakes and liquefactionRetaining walls and anchorsCoastal and offshore foundations
July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.

Canada Water Agency and project partners · 2026

Randle Reef — harbour sediment containment and final capping

Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.

Contaminated ground and waste barriersCoastal and offshore foundationsRetaining walls and anchors
The Nicoll Highway collapse site photographed in April 2024.

Singapore Land Transport Authority / Committee of Inquiry · 2004

Nicoll Highway collapse — excavation design and monitoring decisions

The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.

Excavation supportRetaining walls and anchorsMonitoring and observational design
I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.

Colorado Department of Transportation · 1992

Glenwood Canyon — reinforced walls on compressible foundations

Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.

Reinforced soil and geosyntheticsRetaining walls and anchorsSettlement and consolidation

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.