US 26/89, Snake River Canyon — micropile slope stabilization
A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
11 of 117 project case studies
A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.
Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.
Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.
The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.
Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.
Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.
Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.
The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.
Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| US 26/89, Snake River Canyon — micropile slope stabilization | Rehabilitation | Wyoming Department of TransportationWyoming | 1997 | Study materials |
| River Road, Tucson — tall soil-nailed cuts | Design and construction | Pima County Department of TransportationPima County, Arizona | 2004 | Study materials |
| Pebble Beach Drive — coastal bluff stabilization | Rehabilitation | Del Norte CountyCrescent City, California | 2009 | Study materials |
| US 64 Ocoee Gorge — emergency rockslide stabilization | Rehabilitation | Tennessee Department of TransportationPolk County, Tennessee | 2010 | Study materials |
| 17th Street Canal — floodwall failure and reevaluation | Forensic investigation | US Army Corps of EngineersNew Orleans, Louisiana | 2005 | Study materials |
| Salesforce Tower — staged excavation and artesian-pressure control | Design, construction and performance | Salesforce Tower development teamSan Francisco | 2018 | Study materials |
| Lee Tunnel — diaphragm-wall shafts in water-bearing chalk | Design, construction and performance | Thames WaterEast London | 2017 | Study materials |
| Kobe Port — quay-wall displacement during liquefaction | Design, construction and performance | Port of Kobe / Japanese port researchersKobe | 1995 | Study materials |
| Randle Reef — harbour sediment containment and final capping | Design, construction and performance | Canada Water Agency and project partnersHamilton Harbour, Ontario | 2026 | Study materials |
| Nicoll Highway collapse — excavation design and monitoring decisions | Failure investigation and lessons | Singapore Land Transport Authority / Committee of InquirySingapore | 2004 | Study materials |
| Glenwood Canyon — reinforced walls on compressible foundations | Design, construction and performance | Colorado Department of TransportationI-70, Colorado | 1992 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.