Tempe Marketplace — foundations over former landfill
The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
11 of 117 project case studies
The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.
Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.
Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.
The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.
Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.
Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.
Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.
The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.
The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Tempe Marketplace — foundations over former landfill | Redevelopment | Owner not stated in reviewed caseTempe, Arizona | 2015 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| Prototype Hanford Barrier — long-term infiltration control | Field demonstration | US Department of Energy / PNNLHanford Site, Washington | 2024 | Study materials |
| Treasure Island redevelopment — liquefaction, settlement and shoreline stability | Design, construction and performance | Treasure Island Development Authority / TICDSan Francisco Bay | 2023 | Study materials |
| Freshkills Park — landfill cap, drainage and long-term integrity | Design, construction and performance | New York CityStaten Island, New York | 2011 | Study materials |
| Love Canal — containment cap and barrier drainage | Design, construction and performance | US EPA / New York State Department of Environmental ConservationNiagara Falls, New York | 1985 | Study materials |
| Sydney Olympic Park — engineered waste mounds and leachate management | Design, construction and performance | Sydney Olympic Park AuthorityHomebush Bay, New South Wales | 2022 | Study materials |
| Randle Reef — harbour sediment containment and final capping | Design, construction and performance | Canada Water Agency and project partnersHamilton Harbour, Ontario | 2026 | Study materials |
| Heerlen — heat recovery and storage in flooded mines | Design, construction and performance | Mijnwater / Municipality of HeerlenHeerlen, Limburg | 2014 | Study materials |
| Rocky Flats — engineered covers and long-term groundwater care | Design, construction and performance | U.S. Department of Energy, Office of Legacy ManagementColorado Front Range | 2026 | Original documents |
| Berkeley Pit — mine flooding and hydraulic containment | Design, construction and performance | EPA oversight / responsible mining partiesButte, Montana | 2025 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.