Wolf Creek Dam — karst-foundation cutoff wall
A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
23 of 117 project case studies
A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.
A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.
The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.
The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.
Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.
The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.
The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.
Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.
The upstream embankment slide during the 1971 earthquake became a major case for evaluating liquefaction, residual strength and post-shaking stability.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.
Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.
The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.
A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.
A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.
The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.
The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.
Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.
The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.
Rehabilitation combined a partial-depth barrier, blanket improvements, relief wells and an abutment grout curtain. The project authors explain construction problems in thin limestone units with open flow paths.
The reservoir disaster involved a large pre-existing rockslide and rapid displacement of reservoir water. Geological researchers emphasize the complex shear zone and the influence of groundwater and reservoir operations.
The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.
The 1928 collapse prompted an official investigation and later reassessments of geology and foundation behavior. The records make a useful exercise in distinguishing contemporary findings from subsequent hypotheses.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Wolf Creek Dam — karst-foundation cutoff wall | Rehabilitation | US Army Corps of EngineersJamestown, Kentucky | 2013 | Study materials |
| Center Hill Dam — grouting, cutoff wall and stabilizing berm | Rehabilitation | US Army Corps of EngineersDeKalb County, Tennessee | 2020 | Study materials |
| Herbert Hoover Dike — seepage barriers and structure replacement | Rehabilitation | US Army Corps of EngineersLake Okeechobee, Florida | 2023 | Original documents |
| Folsom auxiliary spillway — rock excavation and foundation preparation | Design and construction | USACE / Bureau of ReclamationFolsom, California | 2017 | Study materials |
| Oroville spillway recovery — erosion-resistant foundation reconstruction | Rehabilitation | California Department of Water ResourcesOroville, California | 2018 | Study materials |
| Teton Dam — internal erosion and first-filling investigation | Forensic investigation | US Bureau of ReclamationEastern Idaho | 1976 | Study materials |
| Olmsted Locks and Dam — marine construction and project controls | Design and construction | US Army Corps of EngineersOhio River, Illinois–Kentucky | 2018 | Study materials |
| 17th Street Canal — floodwall failure and reevaluation | Forensic investigation | US Army Corps of EngineersNew Orleans, Louisiana | 2005 | Study materials |
| Lower San Fernando Dam — liquefaction and post-earthquake stability | Forensic investigation | Los Angeles Department of Water and Power; USACE/USGS investigationsLos Angeles, California | 1971 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| San Vicente Dam raise — rock preparation and RCC interface | Design, construction and performance | San Diego County Water AuthoritySan Diego County, California | 2014 | Study materials |
| Calaveras Dam replacement — seismic foundations and unexpected landslides | Design, construction and performance | San Francisco Public Utilities CommissionSunol Valley, California | 2019 | Study materials |
| Isabella Dam modifications — seismic, seepage and spillway risk | Design, construction and performance | US Army Corps of EngineersKern County, California | 2023 | Study materials |
| East Branch Dam — cutoff-wall construction and verification | Design, construction and performance | US Army Corps of EngineersElk County, Pennsylvania | 2020 | Study materials |
| Clearwater Dam — karst pretreatment and a hanging cutoff | Design, construction and performance | US Army Corps of EngineersWayne and Reynolds counties, Missouri | 2011 | Study materials |
| Bluestone Dam — rock anchors and spillway-foundation protection | Design, construction and performance | US Army Corps of EngineersHinton, West Virginia | 2026 | Study materials |
| Mosul Dam — maintenance grouting in soluble foundations | Design, construction and performance | Iraq Ministry of Water ResourcesTigris River, northern Iraq | 2019 | Study materials |
| Hoover Dam — rock-foundation preparation and remedial grouting | Design, construction and performance | US Bureau of ReclamationColorado River, Nevada–Arizona | 1947 | Study materials |
| Glen Canyon Dam — sandstone abutments and controlled seepage | Design, construction and performance | US Bureau of ReclamationPage, Arizona | 1966 | Study materials |
| Bolivar Dam — seepage barriers in outwash and fractured abutment rock | Design, construction and performance | US Army Corps of EngineersTuscarawas County, Ohio | 2017 | Study materials |
| Vajont reservoir — rockslide, groundwater and observational decisions | Failure investigation and lessons | Historic reservoir project / Italian public investigationVajont Valley | 1963 | Study materials |
| Malpasset Dam — abutment wedge failure and uplift | Failure investigation and lessons | Historic Malpasset water-supply projectFréjus | 1959 | Study materials |
| St. Francis Dam — investigation evidence and foundation reassessment | Failure investigation and lessons | Historic Los Angeles water-supply projectSan Francisquito Canyon, California | 1928 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.