Foundation Design · Cases

Find Engineering Cases

Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

21 of 117 project case studies

The Leaning Tower of Pisa after the stabilization works.

Italian Government / Opera della Primaziale Pisana · 2008

Leaning Tower of Pisa — controlled underexcavation

A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.

Shallow foundationsSettlement and consolidationDewatering and groundwater
Construction of the Marina Bay Sands resort in Singapore.

Marina Bay Sands · 2010

Marina Bay Sands — deep foundations on reclaimed ground

The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.

Piles and drilled shaftsExcavation supportDewatering and groundwater
Salesforce Tower during construction in San Francisco.

Salesforce Tower development team · 2018

Salesforce Tower — staged excavation and artesian-pressure control

The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.

Excavation supportDewatering and groundwaterGround improvement
Glen Canyon Dam under construction in 1962.

US Bureau of Reclamation · 1966

Glen Canyon Dam — sandstone abutments and controlled seepage

The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.

Rock slopes and foundationsDams and leveesSeepage and internal erosion
The Channel Tunnel construction site in May 1991.

Eurotunnel · 1994

Channel Tunnel — geological alignment and water-pressure control

The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.

Tunnels and underground worksRock slopes and foundationsSite investigation
The Asian entrance of the Eurasia Tunnel in Istanbul.

Eurasia Tunnel concession / transport authority · 2016

Eurasia Tunnel — high-pressure mixed-ground TBM crossing

The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.

Tunnels and underground worksEarthquakes and liquefactionDewatering and groundwater
Thames Tideway Tunnel construction at Nine Elms, London.

Tideway · 2022

Thames Tideway Tunnel — variable geology and deep shafts

The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.

Tunnels and underground worksDewatering and groundwaterSite investigation
Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.

Thames Water · 2017

Lee Tunnel — diaphragm-wall shafts in water-bearing chalk

Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.

Tunnels and underground worksExcavation supportDewatering and groundwater
Excavation beneath Northern Boulevard in Queens in December 2012.

Metropolitan Transportation Authority · 2013

East Side Access — frozen support beneath Northern Boulevard

A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.

Tunnels and underground worksGround improvementDewatering and groundwater
The northbound entrance to Kuala Lumpur’s SMART Tunnel.

Department of Irrigation and Drainage / Malaysian Highway Authority · 2007

SMART Tunnel — tunnelling through urban karst

The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.

Tunnels and underground worksRock slopes and foundationsDewatering and groundwater
View into the Love Canal containment area in 2012.

US EPA / New York State Department of Environmental Conservation · 1985

Love Canal — containment cap and barrier drainage

The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.

Contaminated ground and waste barriersSeepage and internal erosionDewatering and groundwater
View from One New Change toward St Paul’s Cathedral.

Land Securities · 2010

One New Change — basement effects on St Paul’s groundwater

Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.

Excavation supportDewatering and groundwaterShallow foundations
The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.

ETH Zurich · 2025

ETH Hönggerberg — seasonal borehole heat storage

The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.

Ground-source energySite investigationDewatering and groundwater
Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.

Swedavia · 2009

Stockholm Arlanda — aquifer thermal energy storage

The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.

Ground-source energyDewatering and groundwaterSite investigation
The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.

Mijnwater / Municipality of Heerlen · 2014

Heerlen — heat recovery and storage in flooded mines

Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.

Ground-source energyRock slopes and foundationsDewatering and groundwater
The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.

EPA oversight / responsible mining parties · 2025

Berkeley Pit — mine flooding and hydraulic containment

The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.

Contaminated ground and waste barriersDewatering and groundwaterRock slopes and foundations

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.