Seattle SR 99 tunnel — soft-ground tunnelling and settlement
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
21 of 117 project case studies
The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.
Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.
The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.
A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.
The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.
The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.
The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.
The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.
The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.
The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.
The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.
The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.
Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.
A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.
The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.
The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.
Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.
The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.
The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.
Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.
The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Seattle SR 99 tunnel — soft-ground tunnelling and settlement | Design and construction | Washington State Department of TransportationSeattle, Washington | 2019 | Study materials |
| Milltown Reservoir — dam removal and contaminated sediment remediation | Remediation and restoration | US EPA / Montana and responsible-party partnersMissoula County, Montana | 2009 | Study materials |
| Ball State University — campus ground-source borefields | Design and construction | Ball State UniversityMuncie, Indiana | 2012 | Study materials |
| Leaning Tower of Pisa — controlled underexcavation | Design, construction and performance | Italian Government / Opera della Primaziale PisanaPisa | 2008 | Study materials |
| Marina Bay Sands — deep foundations on reclaimed ground | Design, construction and performance | Marina Bay SandsMarina Bay, Singapore | 2010 | Study materials |
| Transbay Transit Center — deep excavation beside existing foundations | Design, construction and performance | Transbay Joint Powers AuthoritySan Francisco | 2010 | Study materials |
| Salesforce Tower — staged excavation and artesian-pressure control | Design, construction and performance | Salesforce Tower development teamSan Francisco | 2018 | Study materials |
| Bluestone Dam — rock anchors and spillway-foundation protection | Design, construction and performance | US Army Corps of EngineersHinton, West Virginia | 2026 | Study materials |
| Glen Canyon Dam — sandstone abutments and controlled seepage | Design, construction and performance | US Bureau of ReclamationPage, Arizona | 1966 | Study materials |
| Channel Tunnel — geological alignment and water-pressure control | Design, construction and performance | EurotunnelEnglish Channel | 1994 | Study materials |
| Eurasia Tunnel — high-pressure mixed-ground TBM crossing | Design, construction and performance | Eurasia Tunnel concession / transport authorityBosphorus, Istanbul | 2016 | Study materials |
| Thames Tideway Tunnel — variable geology and deep shafts | Design, construction and performance | TidewayLondon | 2022 | Study materials |
| Lee Tunnel — diaphragm-wall shafts in water-bearing chalk | Design, construction and performance | Thames WaterEast London | 2017 | Study materials |
| East Side Access — frozen support beneath Northern Boulevard | Design, construction and performance | Metropolitan Transportation AuthorityQueens, New York | 2013 | Study materials |
| SMART Tunnel — tunnelling through urban karst | Design, construction and performance | Department of Irrigation and Drainage / Malaysian Highway AuthorityKuala Lumpur | 2007 | Study materials |
| Love Canal — containment cap and barrier drainage | Design, construction and performance | US EPA / New York State Department of Environmental ConservationNiagara Falls, New York | 1985 | Study materials |
| One New Change — basement effects on St Paul’s groundwater | Design, construction and performance | Land SecuritiesCity of London | 2010 | Study materials |
| ETH Hönggerberg — seasonal borehole heat storage | Design, construction and performance | ETH ZurichZurich | 2025 | Study materials |
| Stockholm Arlanda — aquifer thermal energy storage | Design, construction and performance | SwedaviaStockholm Arlanda Airport | 2009 | Study materials |
| Heerlen — heat recovery and storage in flooded mines | Design, construction and performance | Mijnwater / Municipality of HeerlenHeerlen, Limburg | 2014 | Study materials |
| Berkeley Pit — mine flooding and hydraulic containment | Design, construction and performance | EPA oversight / responsible mining partiesButte, Montana | 2025 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.