Cases / Project case study

Stockholm Arlanda — aquifer thermal energy storage

The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.

Ground-source energyDewatering and groundwaterSite investigationMonitoring and observational design
Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.
Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.Nemracc / Wikimedia Commons · Image source · CC BY-SA 3.0

Project evidence

Design & engineering

Partial record

Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.

Sources: s1

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Partial record

The owner reports that the aquifer system began operation in summer 2009.

Sources: s1

Completion & performance

Partial record

The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.

Sources: s1

Engineering methods

Aquifer thermal energy storagePumping and reinjectionThermal plume transportWater balance

Published quantities & cost references

These values retain the scope and date basis of their cited source. Estimates, alternatives and partial packages are identified individually.

Source-backed project quantities and costs
ItemReported valueScope & source
Owner-reported annual energy reduction19 GWh/yearAirport system estimate from the owner description; not a measured heat-pump COP.Owner-reported estimate; no independent performance reconstruction or guarantee implied.Source s1 · Annual energy reduction

Suggested teaching exercise

Capstone project brief

Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.

Starting information & inputs

  • Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.
  • Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors.

Suggested deliverables

  • Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.
  • Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?
  • Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Stockholm-Arlanda Airport aerial view.JPG ↗

Nemracc · 2008

Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.

public-link · CC BY-SA 3.0 · Checked 2026-11-22