US 14 near Nicollet — preload and vertical drains
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
13 of 117 project case studies
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.
The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.
Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.
A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.
An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.
A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.
The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.
The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.
Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.
The 1928 collapse prompted an official investigation and later reassessments of geology and foundation behavior. The records make a useful exercise in distinguishing contemporary findings from subsequent hypotheses.
The quick-clay landslide was filmed during retrogressive movement. NGI explains the remoulding mechanism and publishes strength and geometry evidence used in stability interpretation.
The earthquake triggered destructive ground movement in bluffs underlain by the Bootlegger Cove Formation. USGS later characterized individual facies to examine their roles in the landslide.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| US 14 near Nicollet — preload and vertical drains | Design and construction | Minnesota Department of TransportationNicollet, Minnesota | 2016 | Study materials |
| Olyphant distribution centre — variable mine-spoil improvement | Design and construction | D&L RealtyOlyphant, Pennsylvania | 2022 | Study materials |
| Inuvik–Tuktoyaktuk Highway — embankment over permafrost | Design and construction | Government of the Northwest TerritoriesNorthwest Territories | 2017 | Study materials |
| KY 499, Estill County — pavement swelling investigation | Forensic investigation | Kentucky Transportation Cabinet / University of KentuckyEstill County, Kentucky | 2005 | Study materials |
| Texas SH 6 and SH 21 — expansive-subgrade distress | Forensic investigation | Texas Department of Transportation / Texas A&MTexas | 1996 | Study materials |
| Kansai International Airport — reclamation and long-term settlement | Design, construction and performance | Kansai AirportsOsaka Bay | 2025 | Study materials |
| Port of Brisbane — vacuum consolidation beside a marine park | Design, construction and performance | Port of BrisbaneFisherman Islands, Queensland | 2009 | Study materials |
| West Closure Complex — foundations on soft deltaic deposits | Design, construction and performance | US Army Corps of EngineersNew Orleans, Louisiana | 2011 | Study materials |
| Trans-Alaska Pipeline — thermally stabilized supports in permafrost | Design, construction and performance | Alyeska Pipeline Service CompanyAlaska | 2022 | Study materials |
| Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost | Design, construction and performance | Qinghai–Tibet RailwayQinghai–Tibet Plateau | 2020 | Study materials |
| St. Francis Dam — investigation evidence and foundation reassessment | Failure investigation and lessons | Historic Los Angeles water-supply projectSan Francisquito Canyon, California | 1928 | Study materials |
| Rissa landslide — sensitive clay and retrogressive failure | Failure investigation and lessons | Historic landslide investigation / Norwegian Geotechnical InstituteRissa, Trøndelag | 1978 | Study materials |
| Turnagain Heights — earthquake-triggered bluff failure | Design, construction and performance | USGS / Alaska geological investigationAnchorage, Alaska | 1964 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.