Bowman Road Bridge — reinforced-soil abutments
The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
22 of 117 project case studies
The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.
Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.
UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.
A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.
Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.
A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.
An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.
The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.
Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.
Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.
The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.
The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.
A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.
Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.
The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.
Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.
Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.
Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.
The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.
The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.
Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.
The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Bowman Road Bridge — reinforced-soil abutments | Design and construction | Defiance CountyDefiance County, Ohio | 2005 | Original documents |
| I-15 reconstruction — soft-ground embankments and geofoam | Design and construction | Utah Department of TransportationSalt Lake City, Utah | 2001 | Study materials |
| West Davis Highway ramp — lightweight fill beside live transport | Design and construction | Utah Department of TransportationFarmington, Utah | 2023 | Study materials |
| US 14 near Nicollet — preload and vertical drains | Design and construction | Minnesota Department of TransportationNicollet, Minnesota | 2016 | Study materials |
| Hugh K. Leatherman Terminal — vertical-drain installation control | Design and construction | South Carolina State Ports AuthorityCharleston, South Carolina | 2018 | Study materials |
| Leaning Tower of Pisa — controlled underexcavation | Design, construction and performance | Italian Government / Opera della Primaziale PisanaPisa | 2008 | Study materials |
| Kansai International Airport — reclamation and long-term settlement | Design, construction and performance | Kansai AirportsOsaka Bay | 2025 | Study materials |
| Burj Khalifa — piled-raft settlement design | Design, construction and performance | Emaar PropertiesDubai | 2010 | Study materials |
| Shanghai Tower — excavation compensation and pile–raft interaction | Design, construction and performance | Shanghai Tower Construction and DevelopmentShanghai | 2015 | Study materials |
| Millau Viaduct — rock foundations and observational control | Design, construction and performance | Compagnie Eiffage du Viaduc de MillauTarn Valley | 2004 | Study materials |
| Hong Kong International Airport — foundations across rock and reclamation | Design, construction and performance | Airport Authority Hong KongChek Lap Kok | 1998 | Study materials |
| Changi East reclamation — instrumented vertical-drain design | Design, construction and performance | Singapore reclamation authoritiesEastern Singapore | 2005 | Study materials |
| Port of Brisbane — vacuum consolidation beside a marine park | Design, construction and performance | Port of BrisbaneFisherman Islands, Queensland | 2009 | Study materials |
| Treasure Island redevelopment — liquefaction, settlement and shoreline stability | Design, construction and performance | Treasure Island Development Authority / TICDSan Francisco Bay | 2023 | Study materials |
| Millennium Tower — perimeter-pile underpinning and monitored load transfer | Design, construction and performance | Millennium Tower Homeowners AssociationSan Francisco | 2023 | Study materials |
| Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions | Design, construction and performance | Hong Kong–Zhuhai–Macao Bridge AuthorityPearl River estuary | 2018 | Study materials |
| Freshkills Park — landfill cap, drainage and long-term integrity | Design, construction and performance | New York CityStaten Island, New York | 2011 | Study materials |
| Randle Reef — harbour sediment containment and final capping | Design, construction and performance | Canada Water Agency and project partnersHamilton Harbour, Ontario | 2026 | Study materials |
| Halley VI — relocatable foundations on accumulating snow | Design, construction and performance | British Antarctic SurveyBrunt Ice Shelf, Antarctica | 2017 | Study materials |
| South Pole Station — snow-foundation settlement and levelling | Design, construction and performance | National Science Foundation / U.S. Antarctic ProgramGeographic South Pole | 2019 | Study materials |
| Glenwood Canyon — reinforced walls on compressible foundations | Design, construction and performance | Colorado Department of TransportationI-70, Colorado | 1992 | Study materials |
| Venice MOSE — marine caisson placement and movement monitoring | Design, construction and performance | Italian Ministry of Infrastructure / MOSE projectVenice Lagoon | 2025 | Original documents |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.