Documented projects, design decisions and lessons for engineering practice and capstone studies.

Owner, location & access
Clear filters

22 of 117 project case studies

Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).

Defiance County · 2005

Bowman Road Bridge — reinforced-soil abutments

The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.

Reinforced soil and geosyntheticsShallow foundationsSettlement and consolidation
The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.

Utah Department of Transportation · 2001

I-15 reconstruction — soft-ground embankments and geofoam

Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.

Settlement and consolidationGround improvementReinforced soil and geosynthetics
Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.

Minnesota Department of Transportation · 2016

US 14 near Nicollet — preload and vertical drains

A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
The Leaning Tower of Pisa after the stabilization works.

Italian Government / Opera della Primaziale Pisana · 2008

Leaning Tower of Pisa — controlled underexcavation

A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.

Shallow foundationsSettlement and consolidationDewatering and groundwater
Satellite view of Kansai International Airport and its reclaimed offshore island works.

Kansai Airports · 2025

Kansai International Airport — reclamation and long-term settlement

An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.

Settlement and consolidationGround improvementExpansive, collapsible and organic soils
Burj Khalifa in Dubai.

Emaar Properties · 2010

Burj Khalifa — piled-raft settlement design

The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.

Piles and drilled shaftsShallow foundationsSettlement and consolidation
The Millau Viaduct during construction.

Compagnie Eiffage du Viaduc de Millau · 2004

Millau Viaduct — rock foundations and observational control

Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.

Rock slopes and foundationsPiles and drilled shaftsSettlement and consolidation
Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.

Singapore reclamation authorities · 2005

Changi East reclamation — instrumented vertical-drain design

The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.

Settlement and consolidationGround improvementLaboratory testing and parameters
Aerial view of the Port of Brisbane and adjoining airport in 2015.

Port of Brisbane · 2009

Port of Brisbane — vacuum consolidation beside a marine park

A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.

Ground improvementSettlement and consolidationSeepage and internal erosion
July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.

Canada Water Agency and project partners · 2026

Randle Reef — harbour sediment containment and final capping

Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.

Contaminated ground and waste barriersCoastal and offshore foundationsRetaining walls and anchors
Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.

British Antarctic Survey · 2017

Halley VI — relocatable foundations on accumulating snow

The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.

Permafrost and cold regionsShallow foundationsSettlement and consolidation
The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.

National Science Foundation / U.S. Antarctic Program · 2019

South Pole Station — snow-foundation settlement and levelling

The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.

Permafrost and cold regionsSettlement and consolidationShallow foundations
I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.

Colorado Department of Transportation · 1992

Glenwood Canyon — reinforced walls on compressible foundations

Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.

Reinforced soil and geosyntheticsRetaining walls and anchorsSettlement and consolidation
Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.

Italian Ministry of Infrastructure / MOSE project · 2025

Venice MOSE — marine caisson placement and movement monitoring

The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.

Coastal and offshore foundationsShallow foundationsSettlement and consolidation

From project evidence to a design study

Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.

Topic coverage

Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.