Cases / Project case study

Shanghai Tower — excavation compensation and pile–raft interaction

Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.

Piles and drilled shaftsSettlement and consolidationExcavation supportMonitoring and observational design
Shanghai Tower in Shanghai.
Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.Stefan Fussan · Image source · CC BY-SA 3.0

Project evidence

Design & engineering

Partial record

The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.

Sources: s1 · s2

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Not located in cited sources

Complete as-built drawings and acceptance records were not found in the reviewed sources.

Engineering methods

Piled raftExcavation compensationVariable stiffness

Suggested teaching exercise

Capstone project brief

Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.

Starting information & inputs

  • Extract the construction-stage loads and compressible layers described in the papers.
  • Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading.

Suggested deliverables

  • Compare a compensated-foundation calculation with a simplified interacting pile–raft model.
  • Propose a pile-stiffness distribution and explain its effect on raft curvature.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Can apparent compensation of total stress justify ignoring differential settlement?
  • Which measured response would reveal an overly stiff pile-group assumption?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Shanghai - Shanghai Tower - 0001.jpg — image and reuse license ↗

Wikimedia Commons / Stefan Fussan · 2016

Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.

public-link · CC BY-SA 3.0 · Checked 2026-11-22