Woodrow Wilson Bridge — foundation selection and testing
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
Foundation Design · Cases
Documented projects, design decisions and lessons for engineering practice and capstone studies.
32 of 117 project case studies
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.
Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.
The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.
The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.
USGS reports characterize the deposits and soils associated with the 2014 landslide, providing a basis for ground-model and hazard-assessment exercises.
Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.
The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.
Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.
A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.
The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.
The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.
The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.
Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.
The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.
The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.
Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.
The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.
The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.
The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.
The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.
The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.
The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.
The 1928 collapse prompted an official investigation and later reassessments of geology and foundation behavior. The records make a useful exercise in distinguishing contemporary findings from subsequent hypotheses.
| Title | Type | Owner / location | Year | Access |
|---|---|---|---|---|
| Woodrow Wilson Bridge — foundation selection and testing | Design and construction | Virginia DOT / Maryland State Highway AdministrationPotomac River, Virginia–Maryland | 2008 | Study materials |
| Virginia Route 288 — drilled-shaft quality evaluation | Construction quality and testing | Virginia Department of TransportationRichmond region, Virginia | 2004 | Study materials |
| River Road, Tucson — tall soil-nailed cuts | Design and construction | Pima County Department of TransportationPima County, Arizona | 2004 | Study materials |
| Prudential Center — shallow foundations after improvement | Redevelopment | New Jersey DevilsNewark, New Jersey | 2006 | Study materials |
| Teton Dam — internal erosion and first-filling investigation | Forensic investigation | US Bureau of ReclamationEastern Idaho | 1976 | Study materials |
| Oso SR 530 landslide — investigation and mitigation planning | Forensic investigation | USGS investigation with university and state partnersSnohomish County, Washington | 2014 | Study materials |
| 17th Street Canal — floodwall failure and reevaluation | Forensic investigation | US Army Corps of EngineersNew Orleans, Louisiana | 2005 | Study materials |
| Ball State University — campus ground-source borefields | Design and construction | Ball State UniversityMuncie, Indiana | 2012 | Study materials |
| KY 499, Estill County — pavement swelling investigation | Forensic investigation | Kentucky Transportation Cabinet / University of KentuckyEstill County, Kentucky | 2005 | Study materials |
| Texas SH 6 and SH 21 — expansive-subgrade distress | Forensic investigation | Texas Department of Transportation / Texas A&MTexas | 1996 | Study materials |
| Schoharie Creek Bridge — scour and foundation inspection | Forensic investigation | New York State Thruway AuthorityNear Amsterdam, New York | 1987 | Original documents |
| Hong Kong International Airport — foundations across rock and reclamation | Design, construction and performance | Airport Authority Hong KongChek Lap Kok | 1998 | Study materials |
| Changi East reclamation — instrumented vertical-drain design | Design, construction and performance | Singapore reclamation authoritiesEastern Singapore | 2005 | Study materials |
| Calaveras Dam replacement — seismic foundations and unexpected landslides | Design, construction and performance | San Francisco Public Utilities CommissionSunol Valley, California | 2019 | Study materials |
| Glen Canyon Dam — sandstone abutments and controlled seepage | Design, construction and performance | US Bureau of ReclamationPage, Arizona | 1966 | Study materials |
| West Closure Complex — foundations on soft deltaic deposits | Design, construction and performance | US Army Corps of EngineersNew Orleans, Louisiana | 2011 | Study materials |
| Gotthard Base Tunnel — squeezing rock and adaptive support | Design, construction and performance | AlpTransit GotthardSwiss Alps | 2016 | Study materials |
| Channel Tunnel — geological alignment and water-pressure control | Design, construction and performance | EurotunnelEnglish Channel | 1994 | Study materials |
| Eurasia Tunnel — high-pressure mixed-ground TBM crossing | Design, construction and performance | Eurasia Tunnel concession / transport authorityBosphorus, Istanbul | 2016 | Study materials |
| Thames Tideway Tunnel — variable geology and deep shafts | Design, construction and performance | TidewayLondon | 2022 | Study materials |
| SMART Tunnel — tunnelling through urban karst | Design, construction and performance | Department of Irrigation and Drainage / Malaysian Highway AuthorityKuala Lumpur | 2007 | Study materials |
| Auckland City Rail Link — ground models and settlement baselines | Design, construction and performance | City Rail Link LimitedCentral Auckland | 2023 | Study materials |
| Malpasset Dam — abutment wedge failure and uplift | Failure investigation and lessons | Historic Malpasset water-supply projectFréjus | 1959 | Study materials |
| St. Francis Dam — investigation evidence and foundation reassessment | Failure investigation and lessons | Historic Los Angeles water-supply projectSan Francisquito Canyon, California | 1928 | Study materials |
Each case separates documented project decisions and available records from a suggested capstone exercise. Missing final designs, costs, schedules or completion records are identified. A teaching exercise may require additional assumptions, site investigation or instructor-supplied inputs.
Projects may address several topics. Counts below represent relevant project records, not independent examples for every method.