Cases / Project case study

River Road, Tucson — tall soil-nailed cuts

Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.

Retaining walls and anchorsExcavation supportSite investigationMonitoring and observational design
Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.
Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.© 2011 Google; image reproduced in the ASCE Geo-Institute case history · Image source · No open reuse license verified; original copyright retained

Project evidence

Design & engineering

Partial record

The case describes hollow-bar nails, wall geometry, drainage, facing checks and a loose-seam treatment during excavation.

Sources: s1

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Not located in cited sources

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

Completion & performance

Partial record

The case reports wall and adjacent-structure monitoring; complete construction drawings are not provided.

Sources: s1

Engineering methods

Soil nailingTop-down excavationFace stability

Suggested teaching exercise

Capstone project brief

Prepare a soil-nailed cut design that protects nearby buildings and includes a response to unexpected ravelling material.

Starting information & inputs

  • Extract wall sections, adopted strength, nail rows and drilling restrictions.
  • Identify what the limited original investigation could not resolve.

Suggested deliverables

  • Check global stability, nail pullout, nail tensile resistance and facing demand.
  • Prepare lift sequencing, temporary-face support, drainage and monitoring details.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

River Road widening and realigning, Pima County ↗

ASCE Geo-Institute / named case-history author · 2012

Technical source: Nowatzki and Samtani (2004), Design, Construction, and Performance of an 18-meter Soil Nail Wall.

public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22