Cases / Project case study

Ball State University — campus ground-source borefields

The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.

Ground-source energySite investigationDewatering and groundwaterEstimating, sequencing and project delivery
Geothermal-loop construction at Ball State University, July 30, 2011.
Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.Travisleehardin · Image source · CC BY-SA 3.0

Project evidence

Design & engineering

Partial record

The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.

Sources: s1 · s2

Cost & estimating

Not located in cited sources

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

Schedule & construction

Partial record

The first phase began operating in spring 2012; the later university paper describes the completed base project.

Sources: s1 · s2

Completion & performance

Partial record

Owner information and a system map are linked; detailed bore logs and final bills were not established.

Sources: s1 · s2

Engineering methods

Borefield layoutThermal ground responseDrilling logistics

Suggested teaching exercise

Capstone project brief

Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.

Starting information & inputs

  • Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.
  • Define site-specific thermal-response and groundwater information needed before sizing.

Suggested deliverables

  • Prepare a borehole/loop concept and thermal-interference sensitivity study.
  • Develop drilling, grouting, testing and surface-restoration work packages.
  • A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
  • A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

Design questions

  • Which site data control the decision, and what additional investigation would reduce uncertainty?
  • How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

The brief is a proposed educational exercise based on the cited project, not the original designer's instruction or a complete construction document set.

Sources & original records

Geothermal energy system ↗

Ball State University

public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22