Project authors / Missouri S&T Scholars’ Mine · 2004
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Woodrow Wilson Bridge — foundation selection and testing
Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.
Project evidence
Design & engineering
Partial recordThe project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.
Cost & estimating
Not located in cited sourcesA project-specific estimate, bid schedule or final account was not found in the reviewed sources.
Schedule & construction
Not located in cited sourcesA dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.
Completion & performance
Partial recordThe 2008 paper provides a later construction-stage foundation account.
Engineering methods
Suggested teaching exercise
Capstone project brief
Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.
Starting information & inputs
- Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.
- Record separately the design spectrum and the soil profile used in the foundation response study.
Suggested deliverables
- Develop axial/group and lateral-response checks for a selected pier.
- Compare two foundation alternatives with construction plant, testing and navigational constraints.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.
Design questions
- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?
Sources & original records
Project authors / Missouri S&T Scholars’ Mine · 2008
public-link · Publisher-hosted; redistribution permission not established · Checked 2026-11-22Wikimedia Commons / Doc Searls from Santa Barbara, USA · 2012
Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.
public-link · CC BY 2.0 · Checked 2026-11-22